BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Birmingham, Alabama. Completed plans call for the renovation of a laboratory facility; and medical facility.

Renovation and equipment installation of an existing Heart and Vascular procedure room. The work will be performed using Infection Control measures so that clinical operations can continue without interruption. The project is located contiguous with fully functioning patient clinical areas and Contactors must have significant experience in working in a hospital clinical environment and have knowledge and experience with implementation, monitoring, and maintaining Infection Control and Interim Life Safety Measures as a General Contractor in a Hospital. This project will require significant coordination, working with the Owners' specified equipment vendors, and scheduling to successfully deliver the project. All bidders should be aware that the BCIA establishes goals for MBE/WBE participation. While the goal for each UAB project may vary from project to project and year to year, the minimum goal to be used for UAB projects is 20 percent MBE/WBE participation The estimated construction cost is between $600,000.00 and $800,000.00. Pre-qualification Requirements Information Package may be obtained from the Architect upon letterhead request. The pre-qualification procedure is intended to identify responsible and competent prime contractor bidders relative to the requirements of the Project. Each prospective prime contractor bidder will be notified of the results of the pre-qualification, no later than October 18, 2021 by 5:00 PM Central Time. The Owner reserves the right to waive technical errors in applications, or abandon the pre-qualification process, should the interests of the Owner appear to be promoted thereby. A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Laboratories

$800,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
545
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2021

January 12, 2022

img_map_placeholder

1720 University Blvd, Birmingham, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.