BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in San Antonio, Texas. Working plans call for the renovation of a military facility.

As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information Please NOTE this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS). The NIST score is required before an award can be made. This solicitation is 100 % Small Business Set Aside. This proposed project will be competitive firm-fixed price, Design-Build Build. The North American Industrial Classification System code is 236220 which has a size standard of $39.5 million. A firm-fixed price contract will be negotiated. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. The anticipated award date for this project is in or around 16 May 2022. The magnitude of construction is between $10,000,000 and $25,000,000. Period of Performance: 660 calendar days from Notice to Proceed. Construct a dining facility for 1300 to 1500 personnel at Joint Base San Antonio (JBSA) - Camp Bullis and relocate an existing warehouse that is in the footprint of the dining facility. Construction includes reinforced concrete foundations, structural steel frame with split faced concrete masonry unit veneer and a standing seam metal roof. The project includes utilities, site improvements, pavements, communications infrastructure, and all other work necessary to make complete and useable facilities. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD Antiterrorism/force protection requirements per UFC 4- 010-01. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (47.8%), WBE (6.9%), SBE (100%) period of performance is hereby amended from 660 days to 900 calender days from notice to proceed as per addendum 4.

Final Planning

Military

$25,000,000.00

Public - Federal

Renovation

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
40
Bidding Soon
2,151
All Active Projects
803
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2022

April 15, 2022

img_map_placeholder

2330 Stanley Rd, San Antonio, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.