Published January 3, 2022 at 7:00 PM

Updated November 16, 2023

Site work, paving and outdoor lighting for a mixed-use development in Pendleton, Oregon. Completed plans call for site work for a road / highway; water / sewer project; playground / park / athletic field; for paving for a road / highway; and for outdoor lighting for a road / highway.

The Work consists of, but is not limited to, constructing approximately 3,700 feet of new paved road; approximately 1,800 feet of new paved alley; gravity sewer and water lines; stormwater facilities; utility trenching with conduits for power, telephone, gas, and fiber optics; site grading; lighting; landscaping; park improvements; and other Work as specified and/or as shown on the Drawings to serve the subdivision. Due to the COVID-19 pandemic, a pre-bid conference will not be held for the project.

Bid Results

Roads / Highways

$4,246,135.00

Public - Federal

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
116
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2021

February 7, 2022

img_map_placeholder

To Be Determined, Pendleton, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.