BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Elroy, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The work for which bids are asked includes the following: Approximately 500 lineal feet of sanitary sewer main, sanitary laterals and cleanouts, 700 lineal feet of water main, hydrants, valves, water services, 300 lineal feet of storm sewer and pipe underdrain, dense graded base, and minor asphalt paving on mainline roadways. Initial work must occur by December 31, 2021. The anticipated substantial completion date is April 1, 2022 for all work outside of connecting roadways and May 1, 2022 for all work completed on adjacent roadways. Final completion date is anticipated to be May 15, 2022. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Brian Kehrli, 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 45 days after the actual date of the opening thereof. This project anticipates the use of Community Development Block Grant (CDBG) Funding. Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. The OWNER intends to work with a construction manager on the project. Work and contracts will be coordinated with the construction manager throughout the project along with other work that will occur concurrently on or immediately adjacent to this project area. OWNER reserves the right to waive any informalities or to reject any or all bids.

Award

Water / Sewer

$444,168.00

Public - City

Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
41
Bidding Soon
713
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2021

December 31, 2021

Project location map

S Main St, Elroy, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.