BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 11, 2022 at 7:00 PM

Updated November 14, 2023

Renovation of an educational facility in Worcester, Massachusetts. Completed plans call for the renovation of a educational facility.

The project value listed reflects the total project estimate. The project scope generally includes: Replacement 1670 student High School, constructed adjacent to the existing high school. The project scope generally consists of constructing a new 424,600+ SF building including classrooms, administrative office areas, Media Center, Gymnasium, Cafeteria, Auditorium, Kitchen/Serving, and a 45,574-sf parking garage. The new building is multi-story (on five main levels, one grade floor); fireproofed steel-framed; masonry veneer, fiber cement and metal panel; with single-ply membrane roofing, aluminum windows, and with all associated work including site work, architectural, food service, structural, fire suppression, plumbing, HVAC, electrical, and voice/data/ communications work. Site work generally includes earthwork, utilities, paving, playgrounds, lawns, plantings, site improvements and other items as indicated in the drawings and specifications. The project is a Chapter 149A Project. Work is a phased project with early bidding and early construction consisting of enabling site work at the existing school to add parking, access and separation of the existing site from the construction site; followed by early sitework, structural (concrete and steel) bid; general bidding, construction and occupancy of the school building; followed by the parking lot construction; and lastly the sports field construction. Refer to the detailed schedule and phasing plan published herein. Replacement 1670 student High School, constructed adjacent to the existing high school. The project scope generally consists of constructing a new 424,600+ SF building including classrooms, administrative office areas, Media Center, Gymnasium, Cafeteria, Auditorium, Kitchen/Serving, and a 45,574-sf parking garage. The new building is multi-story (on five main levels, one grade floor); fireproofed steel-framed; masonry veneer, fiber cement and metal panel; with single-ply membrane roofing, aluminum windows, and with all associated work including site work, architectural, food service, structural, fire suppression, plumbing, HVAC, electrical, and voice/data/ communications work. Site work generally includes earthwork, utilities, paving, playgrounds, lawns, plantings, site improvements and other items as indicated in the drawings and specifications. The project is a Chapter 149A Project. Work is a phased project with early bidding and early construction consisting of enabling site work at the existing school to add parking, access and separation of the existing site from the construction site; followed by early sitework, structural (concrete and steel) bid; general bidding, construction and occupancy of the school building; followed by the parking lot construction; and lastly the sports field construction. Refer to the detailed schedule and phasing plan published herein.

Post-Bid

Educational

$219,400.00

Public - City

Renovation

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
733
Active Projects
392
Bidding Soon
5,100
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2021

January 11, 2022

Project location map

299 Highland St, Worcester, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.