BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a civil project in Ketchum, Idaho. Completed plans call for site work for a water / sewer project.

Contract Award Date: May 24, 2022 Contract Award Number: 1240LT22C0028 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: K2 Excavation & Construction Contractor Awarded Address: Terrebonne, OR 97760 USA Base and All Options Value (Total Contract Value): $449720.30 Proposals are being solicited by the USDA, Forest Service for the Alturas Water System Improvement and Cabin Creek Drainage Restoration project for the Sawtooth National Forest. This project is to reconfigure the existing Alturas Lake Water System to allow for existing fill barriers to be removed in two locations from the former Cabin Creek channel near Alturas Lake. Work will consist of 1) connecting a new well that was drilled in 2020/2021 to the existing water supply distribution mainline including installation of a new pump house utility building; 2) modifying the existing water supply distribution mainline terminus at the Alturas Outlet Picnic Area including installation of a new hydrant service; 3) modifying the existing well to accommodate a new hand pump service; 4) removing two existing restrooms (one at the Alturas Outlet Picnic Area and one at the Alturas Tent Campground), including disconnecting from the existing water system, and replacing them with two new precast concrete vault toilets; 5) reconfiguring and reconstructing the existing Alturas Outlet Picnic Area including installation of new site amenities and signage; and removing existing earth barriers from the former Cabin Creek channel; and 6) performing all other miscellaneous improvements as required to complete the necessary project work. This solicitation is anticipated to be issued on or after January 26, 2022. The anticipated start date for administrative and construction preparation tasks is mid-April 2022. On-the-ground construction is anticipated to start September 6, 2022. The project completion date is November 11, 2022. In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $250,000 to $500,000. Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is FREE. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a FREE resource to all small business and your state representative's contact information can be found at the following website: https://www.aptac-us.org/. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the System for Award Management (SAM). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$449,720.00

Public - Federal

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
54
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

September 6, 2022

Project location map

Forest Rd 205, Ketchum, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.