Site work for a water / sewer project in Northport, Alabama. Completed plans call for site work for a water / sewer project.

Furnishing all labor and materials and performing all work for the construction of Water and Sewer Relocation, ALDOT Project No. STPOA-0006(564), Add Lanes and Access Management on SR-6 (US 82)(McFarland Boulevard) from SR-69 to Rice Mine Road, City of Northport, Alabama. Major components of this project include approximately 220 LF of 8" DI water main, 660 LF of 12" DI water main, 300 LF of 12" DI restrained water main (wet ditch crossing), 160 LF of 8" DI gravity sewer main, 160 LF of 10" PVC gravity sewer main, 40 LF of 12" PVC gravity sewer main, 140 LF of 10" DI restrained gravity sewer main, 140 LF of 12" DI restrained gravity sewer main, 160 VLF of manhole installation, 21 VLF of 8" Memphis tee connection riser, 24" steel encasement (bore), with connections to existing active utilities, abandonment of utilities, 70 tons of asphalt paving, and miscellaneous appurtenances. The City of Northport is an equal opportunity employer. All bidders must comply with requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. All Contractors preparing Bids for the referenced project shall submit a list of similar projects (successfully completed) in the last two years, having the same scope of work with construction cost similar to or greater than this project. All nonresident contractors preparing bids shall submit with the bid documents evidence of a current Alabama General Contractor's License, evidence (with original seal of the State of Alabama) of proper registration with the Alabama Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. Bids submitted by a nonresident contractor without these documents included will be rejected. No bidder may withdraw his bid within sixty (60) days after the opening thereof. Bids may be held by the Owner for a period not to exceed sixty (60) days from the date of opening of bids for the purpose of reviewing the bids and investigating the qualifications of the bidders prior to awarding the contract. This project is being funded by Federal funds. All bids should be submitted in the contract specifications book as issued by the Engineer. All bidders must comply with the President's Executive Order Number 11246 which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. All bidders must comply with title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, and the Contract Workhours Act. The attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract. The Owner reserves the right to waive any informality or to reject any or all bids, and to award the contract to the lowest and most responsible bidder. The Contractor will be responsible for notifying the Alabama Department of Transportation in writing 48 hours in advance of beginning construction. The Contractor must contact Mr. James Milligan, Utility Manager, in the Tuscaloosa office at 205-554- 3246.

Award

Water / Sewer

$1,264,305.00

Public - City

Site Work

29

10

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, Air Duct Accessories, Flexible Connectors
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Subdrainage
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Boring Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
45
Bidding Soon
532
All Active Projects
278
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2021

January 21, 2022

img_map_placeholder

Multiple Locations, Northport, AL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water and Sewer Relocation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.