BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cottleville, Missouri. Completed plans call for site work for a water / sewer project.

Sealed bids for the project known as 2021 Sanitary Sewer Lining Project. The City of O Fallon reserves the right to reject any and all bids and waive any informality. The City of O Fallon also reserves the right to select the lowest and/or best bidder as determined by the City in its sole discretion. The purpose of this bid is to obtain competitive unit prices for all labor, material, and equipment necessary to clean and inspect via closed-circuit television (CCTV) existing sanitary and combined sewers ranging in size from 6- to 30-inch diameter. The work includes hydraulic root cutting and cleaning, grinding protruding break-in service connections, remote televising and recording of the sewer. All project locations will be within the Owner service area. The work to be completed on each section of sewer will be performed in phases as defined in the following: 1. Phase 1 Pre-cleaning Inspection. a. The preferred method for Pre-Cleaning Inspection is color CCTV conforming to NASSCO Pipeline Assessment Certification Program (PACP), and for the data to be exported electronically in a PACP certified format. Since this inspection is performed prior to cleaning, it is understood that the video may not provide an "unobstructed view of the entire pipe". b. The Contractor may propose other methods to the Owner prior to bid for inspection such as, zoom camera inspection, digital sidewall scanning inspections, acoustical technology, etc. c. If the Contractor is performing the Pre-Cleaning Inspection, the method must be pre-approved by the Owner prior to inspection of the sewer interior. Phase 2 Sewer Pipe Cleaning. Based on the Owner's review, he or she will determine if additional work will be required. At the sole discretion of the Owner is to either declare the work on the particular sewer segment complete or notify the Contractor of additional work (i.e. Phase 3: Light Sewer Cleaning, Heavy Cleaning, Deposit Cut, Root Cut Medium, Root Cut Ball, or Lateral Cut). Phase 3 Additional Sewer Pipe Cleaning (Optional). The Contractor shall perform the assigned additional work, which may be any one of the following items as defined in these specifications: Light Sewer Cleaning, Heavy Cleaning, Deposit Cut, Root Cut Medium, Root Cut Ball, or Lateral Cut. Phase 4 Post Cleaning Inspection. Final televising of the sewer segment to evaluate the condition of the sewer segment after all cleaning has been performed in Phase 3. Phase 4 will be required to be performed and will be reimbursed at the bid unit price. a. The recorded video must show the entire circumference of the sewer. Any flow control to remove standing water and debris shall be incidental to the contract. It is not the intent of this specification to require bypass pumping to control heavy flow; however, the Contractor must, at a minimum, make reasonable effort to control the flow by using flushing equipment to temporarily retain flow or to remove standing water. The Contractor must also consider weather conditions to obtain the best video image of the sewer. This may require the Contractor to delay any video work after major rain events until the system can return to lower dry weather flow. The Contractor shall submit PACP data to include the electronic video reports, logs, etc. for the Owner's review as required in Part 1 Section 6. b. The segments of sewer to be cleaned and televised through this contract will be located primarily within the paved areas of the public right-of-way; however, there may be some sewer segments that are located within public easements on private property. The successful bidder, with assistance of the Owner as required, will be responsible to coordinate and gain access to any and all sewer segments and will be responsible for any restoration in accordance with Part III Section 5. This will include written authorization between Contractor and landowner. The Contractor shall furnish all labor, components, materials, tools, and appurtenances necessary for the performance and completion of the contract. Award of the contract will be determined through an evaluation of bids and made in light of the best interest of the Owner. The Contractor will be held fully liable for any damages incurred that are caused by his or her negligence. Patents, Trade Secrets, and Copyrights: The Contractor shall pay all license fees and royalties and assume all costs incidental to the use in the performance of the work or the incorporation in the work of any invention, design, process, product or device which is the subject of patent rights, trade secrets protection rights, or copyrights held by others. The Contractor shall indemnify and hold harmless the Owner and Engineer and anyone directly or indirectly employed by either of them from and against all claims, damages, losses and expenses (including attorney's fees and court and arbitration costs) arising out of any infringement of patent rights, trade secret protection rights, or copyrights incidental to the use in the performance of the work or resulting from the incorporation in the work of any invention, design, process, product or device not specified in the contract documents, and shall defend all such claims in connection with any alleged infringement of such rights. Contractors Must Attend a Mandatory Pre-bid Conference at the (Location) located at (Address) at (Time/Date) to discuss the Bidding Documents. Contractors Who Do Not Attend the Pre-bid Conference Will Be Disqualified From the Bidding Process. The purpose of this MANDATORY PRE-BID meeting is to ensure that all companies bidding on the project fully understand the scope of work, definitions and interpretation of all items in the bid documents. Questions may be answered at the MANDATORY PRE-BID; However all questions will be required to be submitted in writing by (Date) to the (Owner and email address) and will be addressed in addendum, Questions and answer will be distributed to all attendees at the MANDATORY PRE-BID meeting.

Award

Water / Sewer

$309,403.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
99
Bidding Soon
1,451
All Active Projects
616
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 22, 2021

December 9, 2021

April 8, 2022

img_map_placeholder

Multiple Locations, Cottleville, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.