BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2022 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Irving, Texas. Completed plans call for site work for a water / sewer project.

For O'Connor Ridge Boulevard Drainage Improvements The work to be performed under this contract consists of furnishing all materials, tools, equipment, labor and incidentals necessary to install complete in place approximately four hundred thirty-six (436) LF of 24" reinforced concrete pipe for drainage together with all associated appurtenances to complete this project at the following location in the City of Irving: 1. On a property located on the south side of O'Connor Ridge Boulevard, 0.3 miles west of N O'Connor Boulevard, within a dedicated public drainage easement. The primary purpose of this study was to provide geotechnical related information and recommendations for: Earthwork Foundation design and construction Pavement sections and subgrade preparation General subsurface conditions within the study area were explored by drilling and sampling a total of 14 borings to the depths shown on the Log of Borings included in the report Illustrations. Data obtained during this study and interpretation of data have been used as the basis for the recommendations provided in this report and are specific to the building pads at the specific locations noted in this report. Use of data, information, and recommendations provided in this report for other purposes, other structures (existing or to be constructed), or evaluations of other locations, will be at the risk and responsibility of the user. We are available, at any time, to discuss the recommendations, information, and concepts provided in this report with owner's design and construction team. As a matter of policy with respect to City of Irving projects and procurements, the City and its contractors shall not discriminate on the basis of race, color, religion, national origin, or sex in the award and performance of contracts. The City's Good Faith Effort (GFE) plan establishes subcontracting goals for all prospective respondents to ensure a reasonable degree of M/WBE participation in city contracts. Participation goals are as follows: Construction - 30%, Architectural & Engineering - 28%, Professional Services, 33%, Other Services - 20%, and Goods - 10%

Award

Water / Sewer

$165,440.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
139
Bidding Soon
3,975
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2021

January 18, 2022

Project location map

O Connor Ridge Blvd, Irving, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.