Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
In general, this work for the total base bid segment consists of: The Contractor shall obtain all permits required for construction, including all City of Houston, Harris County, and Texas Pollutant Discharge Elimination System (TPDES) permits, and submit to LAN prior to commencement of any work. Send notice of construction, by U.S. Mail, to the adjacent property owners at least 7 days in advance of starting work. Enclose work area with black filter fabric fencing and orange plastic construction fencing throughout construction prior to beginning clearing and grubbing or demolition. Protect trees, shrubs, lawns, and utilities outside of detention pond upper bank. Install, maintain, and remove stabilized construction entrance/exit and Storm Water Pollution Prevention Program elements (Appendix B). Implement and maintain a traffic control plan and pedestrian control plan. Remove, by clearing and grubbing, any trees and shrubs within the upper bank. Contractor to coordinate with Owner and Engineer to remove trees outside or near upper bank. Upper bank shall be sufficiently staked prior to clearing and grubbing to allow Owner to determine which trees to preserve. Remove portions of storm sewer lines, manholes, culverts, outfalls, inactive water lines, existing paving as shown on the plans and dispose of offsite. Remove any existing A.C. waterline and any other utility lines uncovered during excavation and dispose per OSHA standards. Excavate the detention pond to the lines and grades shown on the plans. Haul off and dispose of all unused excavated material offsite, including all unsuitable soils encountered as detailed by Section 02323. Clean the streets every evening after any off-site hauling operations. Excavate unsuitable material beyond proposed grade to install 2-foot thick clay liner. The clay liner will be contained within a boundary 4 feet outside the normal water surface elevation. Placement of 12-inch purple AWWA C-900 reclaimed water line, including bends and fittings, per 30 TAC Chapter 210 regulations, 12-inch gate valves and boxes, and 12-inch wet connections. The existing reclaimed water line material varies between HDPE and PVC pipe. The contractor shall verify the material of the existing reclaimed water line before connection is made. The proposed reclaimed line must be fully functional and operational before the removal of existing reclaimed water line. Install proposed outfall structure, including floatables collection screen, slope paving on upstream and downstream sides, emergency overflow swale, concrete pilot channel, 6-inch thick reinforced concrete, stabilized subgrade, and rip rap. Install proposed storm sewer manholes, junction boxes, inlets, interceptor structures, HDPE and RCB pipes. Install rip rap at the upstream transition of existing ditch to proposed pond, as directed in the plans, and at all interceptor structure pipes and storm outfall pipes, as directed by Engineer. Install 6-inch thick, 10-foot wide reinforced concrete access drive along the high bank of the detention pond to proposed detention pond outfall structure and emergency overflow swale, including 4-inch PVC irrigation sleeves under the proposed concrete access drive, perpendicular to proposed hose bibs, for future irrigation connections. Remove and replace damaged portions of existing sidewalks. Haul in, place and install 1-inch compost, mixed with two inches of topsoil, tilled in four to six inches. Then place a 2-inch compost overlay on all areas from the filter fabric fence to the normal water surface elevation of the pond. Alternatively, the Contractor may take soil samples of placed topsoil for soil testing. Based on the results of the soil test and with the approval of the Owner's representative, topsoil may be amended to address any soil deficiencies that would prohibit the growth of the seed. Place native grass seed mix, wildflower mix, and/or cereal rye in the area within the filter fabric fencing to the top boundary of the wetland area after seed bed is prepared, as directed by Engineer. Apply hydro mulch to all seeded areas. In general, this work for the total federally funded pond amenity bid segment consists of: Additional maintenance of Storm Water Pollution Prevention Plan (SWPPP) installed under the total base bid segment, for the purpose of the Federal Grant Funds, as directed by Engineer. Additional maintenance of traffic control plan, for the purpose of the Federal Grant Funds, as directed by Engineer. Install PVC conduit for future aeration system, including pull string, cap both ends, and marking end locations with a PVC pipe. Install 2-inch purple polytubing reclaimed irrigation line and appurtenances and connect to proposed system, including a meter and vault. Install 6-inch thick, 10-foot wide reinforced concrete trail along the high bank of the detention pond, including 4-inch PVC irrigation sleeves under the proposed concrete trail, perpendicular to proposed hose bibs, for future irrigation connections. Install proposed parking lot, driveway, and sidewalks to grade, including curbs, as directed in the plans. Remove and replace damaged portions of existing sidewalks and driveways.
Bid Results
Water / Sewer
$12,796,249.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 16, 2021
January 17, 2022
Multiple Locations, Houston, TX
Related To This Project
Houston, TX
Bid Date: Oct 19 2020
Houston, TX
Bid Date: Sep 30 2019
Houston, TX
Bid Date: Nov 18 2021
Houston, TX
Bid Date: Jun 26 2019
Houston, TX
Bid Date: Jun 10 2019
Houston, TX
Bid Date: Nov 22 2021
Houston, TX
--
Houston, TX
Bid Date: Nov 01 2021
Houston, TX
--
Houston, TX
Bid Date: Jan 14 2022
Houston, TX
--
Houston, TX
--
Houston, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.