BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Montrose, Michigan. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Bids are solicited under a general construction contract for furnishing and installing the following items with related appurtenances in accordance with the Drawings and Specifications entitled "Sludge Dewatering Facilities". Each Bid submitted to GCDC-WWS shall be accompanied by a certified check, cashier's check, money order payable to GCDC-WWS or a Bid bond in an amount not less than five percent (5%) of the total base Bid. Bids submitted without the aforementioned Bid security shall not be read and considered at the Bid opening. If a Bidder is given a Notice of Award and fails to execute the Contract Documents as required by the Specifications within twenty (20) days after issuance of the Notice of Award, the Bidder shall forfeit all claims to the Contract and the amount of the Bid security (whether monies or a Bid bond) submitted with its Bid shall also be forfeited and kept by GCDC-WWS as its sole and separate property as liquidated damages and not as a penalty. GCDC-WWS may accept any Bid or reject any Bid and waive any irregularities in Bids in its sole discretion. A Bidder shall be permitted to withdraw its Bid unopened after it has been deposited if such request is received prior to the time specified for opening Bids, provided Bidder's identity is made known and it signs for the Bid. No Bid may be withdrawn after the opening of the Bids for a minimum of ninety (90) days from the scheduled time for submitting Bids without the written consent of GCDC-WWS. In such event, GCDC-WWS may keep the Bid bond or the money deposited by the Bidder as GCDC-WW sole and separate property. The Genesee County Drain Commissioner, as County Agency, Division of Water & Waste Services, is soliciting proposals from qualified contractors for construction of New Sludge Dewatering Facilities and related appurtenances in Montrose, Genesee County, Michigan.

Award

Water / Sewer

$7,845,005.00

Public - County

New Construction, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
86
Bidding Soon
1,310
All Active Projects
539
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

February 14, 2022

img_map_placeholder

To Be Determined, Montrose, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.