BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2022 at 8:00 PM

Updated March 22, 2024

Site work and paving for a mixed-use development in Pasadena, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

***As of March 8, 2022. The Project has not yet been awarded. The Project is expected to be awarded on March 14, 2022.*** Pre-Bid Meeting: No Online Q&A: No Estimated Bid Value: $5.8 Million to $7.8 Million Project Duration: 160 Working Days The scope of work consists the installing new and modification of existing traffic signals, fiber optic communication, ADA pedestrian ramp improvement, street improvement, and roadway restriping on Union Street, from Arroyo Avenue on the west to Holliston Avenue on the east, and Holliston Avenue from Union Street on the north to Green Street on the south. The work includes furnishing and installing new traffic signal standards, traffic signal equipment, conduit, conductors, pull boxes, traffic signal controller and cabinet, fiber optic communication, ethernet switch, splice enclosure, bulb outs, curb ramps, slurry seal, resurfacing, curb and gutter, striping and signage, removal of existing traffic signals, relocating catch basin, median island, and miscellaneous appurtenant work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$7,689,000.00

Public - City

Paving, Site Work

92

9

6

3

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
546
Active Projects
92
Bidding Soon
3,749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

April 11, 2022

Project location map

Union St & N Holliston Ave, Pasadena, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.