BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Pasadena, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

***As of March 8, 2022. The Project has not yet been awarded. The Project is expected to be awarded on March 14, 2022.*** Pre-Bid Meeting: No Online Q&A: No Estimated Bid Value: $5.8 Million to $7.8 Million Project Duration: 160 Working Days The scope of work consists the installing new and modification of existing traffic signals, fiber optic communication, ADA pedestrian ramp improvement, street improvement, and roadway restriping on Union Street, from Arroyo Avenue on the west to Holliston Avenue on the east, and Holliston Avenue from Union Street on the north to Green Street on the south. The work includes furnishing and installing new traffic signal standards, traffic signal equipment, conduit, conductors, pull boxes, traffic signal controller and cabinet, fiber optic communication, ethernet switch, splice enclosure, bulb outs, curb ramps, slurry seal, resurfacing, curb and gutter, striping and signage, removal of existing traffic signals, relocating catch basin, median island, and miscellaneous appurtenant work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$7,689,000.00

Public - City

Paving, Site Work

92

9

6

3

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
107
Bidding Soon
2,240
All Active Projects
1,000
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

April 11, 2022

img_map_placeholder

Union St & N Holliston Ave, Pasadena, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.