Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Dodge City, Kansas. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of September 22, 2023, a design firm has been selected for the project. Construction is estimated to take place in 2025. *The closed solicitation has been included below for reference: The purpose of this Request for Qualifications (RFQ) is to solicit and select a firm to provide professional engineering design services to construct a second access point to Dodg e City High School. This design work shall be guided by the Phase 1 & Phase 2 recommendations included in the Dodg e City High School Area Transportation Study. If funding is available, the City may be interested in completing design work for some of the future improvements for consideration included in the study. The Design Firm will be working with the City of Dodg e City and KDOT to provide these services. The desired candidate will also be expected to communicate with USD 443 and Dodg e City Community College to ensure that current and future needs are being considered. It will be necessary for the Design Firm to work closely with the Utility Companies to determine if utility relocations will be necessary, if any. It is the City's desire to have these plans completed by late 2022 so that the project, or an initial phase of the project, may be advertised in time for construction to start in the spring/summer of 2023. No pre-submittal meeting will be held. Please contact Ray Slattery or Tanner Rutschman at 620-225-8106 with any questions regarding the RFQ. The method of contractor selection has not been determined at this time.
Design
Roads / Highways
$6,578,600.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
Loretta Avenue and US-50 Highway, Dodge City, KS
Related To This Project
Dodge City, KS
Bid Date: Nov 09 2021
Dodge City, KS
--
Dodge City, KS
Bid Date: Dec 27 2021
Dodge City, KS
Bid Date: Dec 01 2021
Dodge City, KS
Bid Date: Dec 01 2021
Dodge City, KS
Bid Date: Mar 15 2022
Dodge City, KS
Bid Date: Mar 04 2022
Dodge City, KS
Bid Date: Mar 08 2022
Dodge City, KS
--
Dodge City, KS
Bid Date: Sep 27 2023
Dodge City, KS
Bid Date: Sep 21 2023
Dodge City, KS
Bid Date: Sep 21 2023
Dodge City, KS
Bid Date: Sep 01 2023
Dodge City, KS
Bid Date: Sep 01 2023
Dodge City, KS
Bid Date: Aug 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.