Site work, paving, outdoor lighting and new construction of a mixed-use development in Bogota, New Jersey. Working plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a road / highway; and water / sewer project.
As of July, this project is currently on hold. It is unclear when it will commence. Bids will be received for a Single Overall Contract, where the entire project will be executed by a single firm with undivided responsibility for performance and other requirements. Construct new parking lot of approximately 30,000 S.F. in area including milling, backfill, paving and striping, dynamic compaction of 20,000 S.F. in area with roughly 4000 C.Y. of RCA backfill, new stormwater drainage and green infrastructure system including 400 L.F. of storm pipe and 120 chamber units, new pump station including 775 L.F. of force main pipe and 150 L.F. of gravity sewer, elevated generator platform, new asphalt pathways, concrete sidewalks, concrete driveways, concrete curb, lighting, demolition, soil erosion measures, landscaping including planting of roughly 90 trees and related improvement to complete the project. The Scope of Work for the Borough of Bogota Recreation Center Building is as follows: Construct a new one (1) story steel structure building at 15,734 sq. ft. of enclosed space and 5,308 sq. ft. of roofed outdoor space. Walls are a combination of masonry and metal panel systems. Enclosed space includes a gymnasium office/classrooms/interpretive center with toilet rooms, locker rooms, and a concession stand. Indoor storage is also provided in the building. Work includes foundations, structural steel columns and roof. The walls include masonry, steel skin, windows, and doors including outdoor terraces and gathering area. The entire building is sprinklered and is served by new electrical, plumbing, HVAC, generator, fire alarm, and a security system that are shown on the building plans. Time of Completion for this project is 545 calendar days from the Notice to Proceed. Liquidated Damages for this project is at $2500 per calendar day. Maintenance Guarantee for the project is 100% of Project cost for 2 years from the acceptance of work. The Borough reserves the right to limit the number of sets given to any bidder. Bids must be prepared on the forms furnished with the specifications and must be enclosed in a sealed envelope. The Borough reserves the right to reject any or all Bids for any and all causes as may be permissible in the Local Public Contracts Law. Pursuant to N.J.S.A. 34:11-56.37 and 34:11-56.38 of the Prevailing Wage Act,no public works contract may be awarded to any contractor and subcontractors or to any firm, corporation or partnership in which they have an interest while on the Debarred Contractors List until the expiration date given. The proposal is being solicited through a fair and open process in accordance with the N.J.S.A. 19:44A-20.4 et seq. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq, and N.J.A.C. 17:27, which deal with Affirmative Action in relation to discrimination in connection with certain public contracts. All construction contracts equal to or greater than $1,000,000 must comply with N.J.A.C. 17:27-7.4. All bids must comply with the local Public Contract Laws, N.J.S.A. 40A:11-1 et seq. Bids received after the time for opening bids will be returned unopened. All bids must be accompanied by electronic version in CD/DVD/ Flash Drive Form.
Pre-Construction/Negotiated
Playgrounds / Parks / Athletic Fields
$300,000.00
Public - City
New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 6, 2022
August 8, 2022
253 W Fort Lee Rd, Bogota, NJ
Related To This Project
Bogota, NJ
Bid Date: Feb 24 2022
Bogota, NJ
Bid Date: Aug 10 2022
Bogota, NJ
Bid Date: Mar 14 2023
Bogota, NJ
Bid Date: May 10 2019
Linden, NJ
Bid Date: Jul 15 2022
Joint Base Mdl, NJ
--
Morristown, NJ
Bid Date: May 18 2022
Bound Brook, NJ
Bid Date: May 18 2022
Ramsey, NJ
Bid Date: May 19 2022
Morristown, NJ
Bid Date: Jun 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.