BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Montreal, Quebec. Completed plans call for the renovation of a playground / park / athletic field.

Reference number : 1540056 Deadline for receipt of complaints: 2021-11-16 Electronic submission accepted: Yes, in a single submission document Expected duration of the contract (in months): 18 Value of the Bid Security (amount or percentage) The tender must be accompanied by a tender guarantee issued in favor of Parc Olympique corresponding to 10% of the amount of the tender. This tender guarantee must be valid for the entire period of validity of the tender. This tender guarantee must be presented in the form of a bond, irrevocable letter of guarantee, certified check, money order or draft and comply with the following conditions: in the form of a bond issued by a financial institution and meeting the requirements of the Olympic Park Bid Bond form; in the form of certified check, money order, draft or irrevocable letter of guarantee in accordance with the provisions of the Irrevocable Olympic Park Letter of Guarantee form issued by a financial institution. When the tender guarantee is presented in a form other than a tender bond or an irrevocable letter of guarantee, it can serve as a performance guarantee and a guarantee of the contractor's obligations for pledges, mate The works consist mainly in the supply of labor, materials, equipment, material and services necessary to carry out this lot. The Contractor must do all the electrical work required according to the plans and specifications, more particularly divisions 01, 23, 26, 27 and 28 to have a complete and functional work. He must take into account the following list of tasks which is neither exhaustive nor restrictive: Shop drawings and technical data sheets for all products supplied must be presented to the engineer for approval; Coordination plans should be prepared in collaboration with other mechanical and electrical contractors; The coordination of the work with the other contractors must be carried out by the Electrical Contractor and approved by the Engineer and the Construction Manager; Provide all access hatches required in the new partitions; Supply and install all access hatches required in existing walls, slabs or partitions; Identify all the components according to the specifications of the technical specifications; Hoist the workplace and erect all its material and equipment; Do the gradual and final cleaning of his work area; Make the electrical connections of his tools on the power supply provided by the Construction Manager; Supply and install all scaffolding required for the work; Carry out demolition work on the remaining existing facilities required to do the new electrical work; Make all the holes required for the work; Supply and install all caulking and acoustic sealant required according to the types of partitions or floors; Provide all anchors, suspensions, cable tray required for the work. The content of this article should not be considered as limiting. For more details and details, refer to the Plans and Specifications and other documents forming part of this mandate. In addition to the requirements indicated in the plans and specifications, the following elements are also included in this contract: All the equipment, tools and materials necessary for the work of this lot as specified in the plans and specifications; All safety and protection measures specific to the work of this call for tenders; Cleaning and maintenance of the site and accesses, signage and signalers relating to the work of this lot; All the surveying and measuring work necessary for the complete realization of the work of this lot; The movement of workers on the site to reach their place of work; Board and travel expenses for all workers and subcontractors; Management of noise, dust, concrete splinters, paint / membrane, water or any other contaminant specific to its work; Scaffolding and other temporary installations required for the work; All required tests and related documentation; The lifting plan, work procedures and temporary installation certificates signed and sealed by an engineer member of the OIQ; The development of working methods; The evacuation of all waste specific to its work in containers made available by the Construction Manager on floor 611 with the exception of existing ventilation units which are to be demolished. For these, demolition and evacuation of debris to the waste container located outside on the ground floor are the responsibility of the Contractor; Positioning of openings, x-rays of slabs and walls and openings for the passage of conduits relating to the work of this lot; The leveling of the walls, ceilings and floors following the demolition work of this lot; Work in several stages or in continuous or discontinuous phases; All costs related to Covid-19; Coordination with the Construction Manager to obtain access to the premises located outside the Tower and required for his work as defined in these documents; Sealing around all openings required for the passage of ducts; Provide the necessary resources for monitoring and coordination with other electromechanical contractors who meet the concept according to BIM, on 3D modeling; Attend weekly BIM coordination meetings with the various project stakeholders; The Olympic Park uses the Procore platform for project management and provides the required licenses. The Contractor must participate and collaborate in the use of the software with the Construction Manager; When working at height, the Contractor must submit a work method which must be approved by the competent authorities. In addition, for work outside and on the roof of the Tower, the Contractor must ensure that all the tools and materials used must be secure and well attached to prevent falls and accidents; The protection of surfaces and existing structures during the works of this lot, among others and without being limited to the canvas of the Stadium, the cupolas of the CSPO, the curtain walls of the Tower, etc .; Inspection and repair at the Contractor's expense in the event of falling material or equipment; Development of a work protocol respecting Safety Code 6 (Limits of human exposure to radioelectric electromagnetic energy in the frequency range from 3 kHz to 300 GHz) in order to ensure the health and safety of workers during the work near the aerials on the roof. Bid bond 10% is required. Performance bond and materials and services of each corresponding 50% is required.

Award

Playgrounds / Parks / Athletic Fields

$3,929,200.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
106
Bidding Soon
1,734
All Active Projects
702
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2022

February 8, 2022

img_map_placeholder

4545 Av. Pierre-De Coubertin, Montreal, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.