BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Chapel Hill, North Carolina. Completed plans call for the renovation of a laboratory facility.

In accordance with GS133-3 and SCO procedures there will be a public meeting preceding the November 10, 2021 Pre-Bid Meeting at 10:45 AM to identify preferred Brand Alternates and their performance standards that the Owner will consider for approval on this project. Refer to the Project Manual for additional Information. Contact theDesigner to obtain the web link to the virtual meeting. Project Location: 125 South Rd. Chapel Hill, NC 27599 If the goal of 10% participation by HUB Certified/ minority business is not achieved, the Bidder shall provide the following documentation to the Owner of his good faith efforts: A. Contractor shall furnish and install a direct digital control and building automation system (BAS) to control mechanical equipment included in this contract. The new BAS shall utilize electronic sensing, microprocessor-based digital control, and electronic actuation of dampers, valves and devices to perform control sequences and functions specified. Refer also to control drawings, sequences of operation, and point lists. B. The HVAC distributed digital control (DDC) and building automation system (BAS) defined in these specifications shall furnish and install a complete system utilizing one of the following: 1. A LON based Building Automation System (BAS) utilizing Lontalk ANSI 709.1 protocol for all mechanical systems and other facility systems as included in the project documents. 2. Or, a BACnet based BAS utilizing ASHRAE 135 standard BACnet protocol. Towards this end, contractor shall provide all specified objects and services and have them configured/mapped as applicable. C. The BAS defined in these specifications shall interface with existing approved BAS servers located at or operated by EMCS, Giles Horney Building. Reference also controls drawings, sequences of operation, and point lists. Scope of Work: The Party of the First Part shall furnish and deliver all of the materials, and perform all of the work in the manner and form as provided by the following enumerated plans, specifications and documents, which are attached hereto and made a part thereof as if fully contained herein: advertisement; Instructions to Bidders; General Conditions; Supplementary General Conditions; specifications; accepted proposal; contract; performance bond; payment bond; power of attorney; workmen's compensation; public liability; property damage and builder's risk insurance certificates; approval of attorney general; certificate by the Office of State Budget and Management, and drawings, titled The demolition phase will include removal of the existing service entrance switchboard, three existing utility transformers and service entrance bus duct. The new work phase will include the installation of a new service entrance rated switchboard, utility transformer, underground primary and secondary ductbanks, and the interception of the existing feeders and bus ducts fed from the existing switchboard scheduled to be demolished.

Bid Results

Laboratories

$1,074,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
119
Bidding Soon
1,741
All Active Projects
712
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 22, 2021

January 14, 2022

September 27, 2022

img_map_placeholder

125 South Rd, Chapel Hill, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.