BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2021 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Bloomington, Illinois. Completed plans call for site work for a water / sewer project.

CSO Lagoon Outfall Improvements, generally including all labor, supervision, materials, supplies, transportation, equipment and services necessary and required as set forth in the Contract Documents. A certified check or bank draft payable to the order of the Bloomington and Normal Water Reclamation District or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Base Bid shall be submitted with each Bid

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
68
Bidding Soon
1,159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2021

December 17, 2021

Project location map

Multiple Locations, Bloomington, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.