Renovation of a municipal facility in Plymouth Meeting, Pennsylvania. Completed plans call for the renovation of a 7,317-square-foot municipal facility.

This project will have four separate prime contracts, General Construction, Mechanical, Plumbing and Electrical. Location- 700 Belvoir Rd Plymouth Meeting, PA 19462 Renovation of an existing 43,845 SF, 1-story and partial basement, Municipal Building with Township and Police Department functions, renovation of an existing 7,317 SF Public Works Building, associated site work and other Work indicated in the Contract Documents. 1. Interior gypsum wallboard, including abuse-resistant gypsum board.. 2. Tile backing panels. 3. Ballistic resistant fiberglass panels for installation in gypsum board assemblies. 4. Non-load-bearing steel framing for gypsum board assemblies. 5. Structural laminate corner finishing units for gypsum board assemblies, designed to bond structurally with gypsum panels to prevent cracks. 6. Sound attenuation blankets and acoustical sealant for gypsum board assemblies. 7. Installation of access panels in gypsum board assemblies ASTM C 754, and ASTM C 840 requirements that apply to framing installation. 1. Metal pass-through evidence locker unit with hinged doors and mail slot. 2. Metal pass-through evidence locker unit in custom configuration with hinged doors and refrigerated insert. a. Main door keyed; interior doors drop keyed. b. Furnish 2 keys per lock and one master key. 1.2 SYSTEM DESCRIPTION Each bid must be accompanied by a certified check or bid bond payable to the order of Plymouth Township executed by the bidder and acceptable surety, in an amount equal to ten (10%) percent of the base bid amount. Plymouth Township hereby reserves the right to reject any or all bids submitted, or any portion thereof, and also reserves the right to waive any informalities or irregularities in bids received, when, within the sole discretions of the Township, such rejection or waiver is in the best interests of the Township. The contractor shall complete the Contractors Responsibility Certification Form provided, and shall submit the Form to the Township, to the attention of Karen B. Weiss, Manager, via E-mail to kweiss@plymouthtownship.org, no later than fourteen (14) days prior to the bid opening date, together with all documentation required by Section 2-25A(3) of Ordinance 1646, a copy of which is provided, in order to be pre-qualified before submitting a bid. The amount and type of Bid Security is stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier's check made payable to Owner or a bid bond issued by a surety licensed to conduct business in the state where the Project is located and named in the current list of "Surety Companies Acceptable on Federal Bonds" as published in the Federal Register by the Audit Staff Bureau of Accounts, U.S. Treasury Department Contractor covenants and agrees to furnish Municipality with the following bonds in a form satisfactory to the Municipality with sufficient surety or sureties, which bonds shall be attached hereto and made a part hereof: A A Performance Bond in the amount of one hundred percent (100%) of the Contract Price for the faithful performance of the Agreement; B. A Material and Labor Bond in the amount of one hundred percent (100%) of the Contract Price for the payment of all persons performing labor or furnishing materials in connection with this Agreement; and, C. A Maintenance Bond in the amount of ten percent (10%) of the Contract Price for the maintenance of the work performed under this Agreement for a period of one (1) year from the date of completion and acceptance of the work performed under this Agreement. Clarification Deadline: 11/16/2021 10:00 AM The project value listed reflects the total project estimate.

Award

Municipal

$8,221,800.00

Public - City

Renovation

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Operation Data, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Maintenance of Membrane Roofing, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Markerboards, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Storage Specialties, Storage Assemblies, Mobile Storage Shelving, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Static Uninterruptible Power Supply, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Public Address and Mass Notification Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Bored Piles, Drilled Concrete Piers and Shafts, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
236
Bidding Soon
4,190
All Active Projects
1,988
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2021

January 24, 2022

img_map_placeholder

700 Belvoir Rd, Plymouth Meeting, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Plymouth Township Municipal Campus Renovation Project - General Construction ReBid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.