Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a power facility in Falcon Heights, Minnesota. Completed plans call civil work for a power facility.
Construction Manager Services for replacement of controls at the St. Paul Heating Plant. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. St. Paul Heating Plant Controls Replacement Estimated Cost of Work for Construction: $3,374,578 Before submitting questions about the RFP via the Questions Tab, read and review the RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY DOCUMENT and ALL Attributes in the Attributes Tab. These provide valuable information and address frequently asked questions. The scope of the Project includes replacing the aging St. Paul Heating Plant controls for Boilers 7 and 8, and for the balance of plant. Scope of Work to include design and implementation of new control panels, retrofitting of existing control panels, field wiring, new operator workstations, new network closet with space conditioning, and possibly remodel the control room to make room for the workstation furniture. KFI Engineers is the Architect/Engineer of Record for the Project.
Award
Power Plant
$3,374,578.00
Public - State/Provincial
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
November 16, 2022
November 29, 2022
March 31, 2023
1952 Commonwealth Ave, Falcon Heights, MN
Related To This Project
Falcon Heights, MN
Bid Date: Nov 17 2022
Falcon Heights, MN
Bid Date: Jun 15 2020
Falcon Heights, MN
Bid Date: Apr 21 2022
Falcon Heights, MN
Bid Date: Jul 15 2022
Falcon Heights, MN
--
Falcon Heights, MN
Bid Date: Jul 22 2022
Falcon Heights, MN
Bid Date: Oct 17 2024
Falcon Heights, MN
Bid Date: Apr 20 2023
Lyra Township, MN
Bid Date: Nov 14 2022
Rice, MN
Bid Date: Nov 15 2022
Blaine, MN
--
Sauk Rapids, MN
Bid Date: Nov 17 2022
Albert Lea, MN
Bid Date: Nov 15 2022
Preston, MN
Bid Date: Nov 28 2022
Norway Township, MN
Bid Date: Nov 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--