BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work, paving, outdoor lighting and new construction of a mixed-use development in Saint-Constant, Quebec. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; 838-space sidewalk / parking lot; sidewalk / parking lot; transportation facility; for the construction of a three-story above grade, 825-space parking garage; and parking garage.

Construction of a terminus and its multi-level parking at Sainte-Catherine station. The complex will include a bus station with at least three platforms, at least one of which is accessible by coach, a bus platform for temporary surface service, a drop-off point, a landing stage for paratransit, a street bus platform for each direction with refuge, an emergency exit for neighboring condominiums, safe routes for active modes, a bicycle parking area. The desired parking capacity is between 740 and 838 spaces. Multi-level parking will be represented by a three-storey building that will be added to the facilities described above. The total capacity of this parking garage will be 825 car spots. Scope of work and project budget are being finalized. Note. The construction of the multi-level parking structure is conditioned by the fact that the Municipality of Saint-Constant intends to recover the site of the current 395-place parking lot to build a school. TIMELINE: The awarded professional consultant has submitted to the owner a report including scenarios and a brief functional and technical program (FTP) for the project implementation. Project parameters, value and timelines of implementation are being finalized. Timelines of further project development are not determined. Project will be followed if/when it proceeds to a design stage. Coverage of this report has been discontinued.

Project Abandoned

Parking Garage

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
124
Bidding Soon
1,647
All Active Projects
697
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2026

img_map_placeholder

333 Rue Sainte-Catherine, Saint-Constant, QC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.