BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Rockford, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Rockford Park District invites firms to submit Statement of Qualifications and Performance Information to provide design and construction services associated with the development of Phase 1 of the Alpine Hills Adventure Park Multi-Use Trails. This project is being financed, in part, with federal funds from the Recreational Trails Program (RTP) administered by the Illinois Department of Natural Resources. The Grantee shall encourage 1) "minority" business firms to 's submit Proposals on the approved project, and 2) successful contract bidders to utilize minority businesses as sub-contractors for supplies, equipment, services and construction. The Rockford Park District reserves the unrestricted right to reject any or all Proposals received, to waive or not to waive any informality, or /3 to accept the Proposal considered to be in the best interest of the Park District. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the IL Wages of Employees on Public Works Act (820 ILCS 130/1-12). Phase 1 is to include, at a minimum, a 3'-4' wide, 1.2 mile long trail that is designed specifically for beginner level riders. The trail is intended to be an introduction to mountain biking, yet offer features designed for all levels of riders by including a variety of technical features such as log rides and boulder causeways. The trail shall have a unique natural flow by building undulation in the terrain and in-sloping corners to optimize the bike experience. The trail shall also connect to the surrounding neighborhoods. The Park District anticipates this trail to be a combination of the "Perimeter Loop Trail" and "Gateway Trail" shown in the Alpine Hills Silent Sports Updated Master Plan developed in 2019-2020. Additional length, beyond the minimum of 1.2 miles, of the Perimeter Loop Trail and the Gateway Trail shall be included as funding allows. Trail construction is to meet International Mountain Biking Association (IMBA) standards. The trail configuration shown in the previously completed plans are intended to be used as a conceptual level trail layout. The Park District expects a revised trail layout plan to be completed as a part of this project. Portions of the property are located within flood plain and floodway. Trail Designer/Builder shall work with Park District to complete due diligence to identify appropriate authorities having jurisdiction and permitting requirements. Trail Designer/Builder to provide opportunities for Park District staff to observe and receive training on trail construction means and methods.

Post-Bid

Roads / Highways

$68,600.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
180
Bidding Soon
3,913
All Active Projects
1,547
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 1, 2021

February 11, 2022

May 15, 2022

img_map_placeholder

4402 Larson Ave, Rockford, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.