Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 13, 2025 at 7:00 PM
Updated October 1, 2024
Site work for a military facility in Cutler, Maine. Conceptual plans call for site work for a military facility.
This project will provide Antiterrorism (AT) features and comply with AT regulations, and physical security mitigation in accordance with DoD Minimum Antiterrorism Standards for Buildings. This project includes an entry control facility (ECF) that includes an entry control point fence, a guard and truck inspection office, a main entry canopy and a restricted area security fence. The entry control point fence includes a chain link security fence and sliding gates. The double lane main entry canopy will be used for identification checks and is comprised of concrete structural elements and an exposed steel canopy structure. The guard and truck inspection office will be adjacent to the main entry canopy. The project also constructs a security fence and installation of cameras/radars throughout the installation. Magnitude of Construction: $25,000,000 to $100,000,000 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Military
$100,000,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2023
February 26, 2026
To Be Determined, Cutler, ME
Related To This Project
Cutler, ME
Bid Date: Jul 06 2023
Cutler, ME
Bid Date: Jul 07 2023
Cutler, ME
Bid Date: Aug 27 2021
Cutler, ME
Bid Date: May 02 2024
Cutler, ME
Bid Date: Jun 05 2024
Cutler, ME
Bid Date: Jul 19 2024
Cutler, ME
Bid Date: Mar 12 2025
Houlton, ME
Bid Date: Dec 12 2022
Portland, ME
Bid Date: Dec 14 2022
Cape Elizabeth, ME
Bid Date: Dec 08 2022
South Bristol, ME
Bid Date: Nov 30 2022
Kittery, ME
--
Kittery, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.