Site work and paving for a road / highway in Middletown, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of January 7 the project was awarded to Milcon Concrete Inc for $ 7,671,291.59. A written order issued by the Engineer to the Contractor, covering changes in the plans or quantities, or both, within or beyond the scope of the Contract and establishing the basis of payment and time adjustments for the work affected by the changes. Revisions to the Contract Documents (4.1). The City reserves the right to revise the Scope of Work in Contract Documents at any time. Such revisions do not invalidate the Contract or release the Surety, and the Contractor agrees to perform the Work as revised. A. Differing Site Conditions. During the progress of the Work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the Contract Documents or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the Work provided for in the Contract Documents, are encountered at the site, the Contractor shall notify the Engineer of the specific differing conditions before they are disturbed or the affected Work is performed. B. Suspension of Work. If the performance of all or any portion of the Work is suspended or delayed by the Engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) for reasons other than those set forth in Section 5 herein and the Contractor believes that additional compensation or time is due as a result of such suspension or delay, notify the Engineer as specified in F. The City will not make an adjustment under this subsection in the event that performance is suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this Contract. C. Significant Changes in Character of the Work. The Engineer may alter the Work as necessary to complete the Project. If the alterations or changes in quantities significantly change the character of the Work under the Contract, an adjustment, excluding anticipated profit, will be made to the Contract. D. Eliminated Items. The City may partially or completely eliminate contract items. The City will make an adjustment to compensate the Contractor for the reasonable cost incurred in preparation to perform the eliminated Work prior to the date of the Engineer's written order eliminating the Work. E. Extra Work. Contractor shall perform extra work as directed by the Engineer. The City will pay for extra work as specified in these General Provisions. F. Contractor Notification. 1. Contractor Initial Oral Notification. Provide immediate oral notification to the Engineer upon discovering a circumstance that may require a revision to the Contract Documents or may result in a dispute. Upon notification, the Engineer will attempt to resolve the identified issue as quickly as possible. 2. Contractor Written Early Notice. If the Engineer has not resolved the identified issue within 2 workdays after receipt of the oral notification, provide a written notice of any circumstance that may require a revision to the Contract Documents or may result in a dispute. This early notice must be given by the end of the second workday following the occurrence of the circumstance. The Engineer and Contractor shall maintain records of labor, equipment, and materials used on the disputed work or made necessary by the circumstance. Such records shall start when early notice is received by the Engineer. 3. Continuation of Work. The Contractor shall continue with all Work, including that for which notice has been given. The City will continue to pay for Work. 4. No Contract Adjustment Without Notification. The City will not make the adjustments allowed if the Contractor did not give the appropriate notices. Cleaning Up (4.2). Contractor shall maintain the Project in a presentable condition. Remove all rubbish, layout stakes, sediment control devices as directed by the Engineer, excess material, temporary structures, and equipment, including stream channels and banks within the Right-of-Way at drainage structures, and all borrow and waste areas, storage sites, temporary plant sites, haul roads, and other ground occupied by the Contractor in connection with the Work. Contractor shall establish suitable vegetative cover in these areas by seeding and mulching, except for cultivated fields. Contractor shall leave the Project site in an acceptable condition as determined by the Engineer. The cost of cleanup is incidental to all contract items. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Roads / Highways

$7,671,292.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
48
Bidding Soon
994
All Active Projects
421
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2021

December 30, 2021

img_map_placeholder

Central Ave, Middletown, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.