BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 30, 2021 at 7:00 PM

Updated January 29, 2024

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Water, Sanitary Sewer, and Drainage to Serve Breckenridge East Section 5 within Harris County Municipal Utility District No. 82 HCFCD PROJECT NO. 2107300114 ILMS NO. 21075904 HCPID PROJECT NO.: 2105180003 DETENTION POND (APPROVED H.C. PRJ NO.): 2J0521001 H.C. STORM SEWER (APPROVED H.C. PRJ NO.): 2107020129 APPROVED H.C. PROJECT NO.: 2106170030, 2106180050 PROJECT NO. 3146272-05, CONTRACT NO. 2 (PAV) PROJECT NO. 3146272-05, CONTRACT NO. 1 (WS&D) VSE Project No: 05919-005-1-UTL (c/b) If awarded the Contract, the undersigned will furnish Certificates of Insurance and a Performance Bond, Payment Bond and two-year Maintenance Bond in the full amount of the Contract a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances; (2) Construct and adjust sanitary sewer, manholes and appurtenances; (3) Repair existing pavement affected; (4) Furnish and install all subsidiary items as necessary to complete the project; (5) Perform testing as specified on installed lines; and (6) Clean-up project area upon completion.

Bid Results

Water / Sewer

$1,797,709.00

Public - County

Site Work

38

18

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
406
Active Projects
237
Bidding Soon
3,786
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2021

December 20, 2021

Project location map

To Be Determined, Houston, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.