BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Kenosha, Wisconsin. Completed plans call for the renovation of a educational facility.

As of 11/18/2021 Estimated cost of 4,500,000 to $5,000,000. The Kenosha Unified School District (KUSD) invites qualified general contractors to bid on summer of 2022 exterior window replacement projects at the nine district buildings listed above. The projects are being funded by ESSER II funds, which requires the use of the Davis Bacon Prevailing Wage Rates for Kenosha County. Project scope of work includes, but is not limited to, exterior window replacement, general carpentry, masonry repairs, sealants, interior finishes and window treatments. Demolition and disposal of the existing insulated panels and windows will require the services of an abatement contractor. KUSD will contract separately for this scope of work, which includes material testing, abatement, air testing and material disposal related to the abatement work. Detailed schedule coordination of demolition work and general construction services under these bid packages will be required. . This project will be considered a "Turn-Key" window installation project, which includes all of the necessary permits, fees and approvals included in the contractor's bid. The Kenosha Unified School District (KUSD) reserves the right to accept or reject any or all bids/proposals, to waive any informality or technicality in any bid/proposal submitted, and to accept any part of a bid/proposal deemed to be in the best interest of KUSD. KUSD reserves the right to negotiate with any company after the bid opening has occurred. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. BId Result. BASE BID #1: BOSE & JEFFERY :Camosy Construction $391,150.00 BASE BID #2: HILLCREST & MCKINLEY:Camosy Construction $611,200.00 BASE BID #3: WASHINGTON:Selzer-Ornst Construction $1,697,738.00 BASE BID #4: WHITTIER & SOMERS:Camosy Construction $311,975.00 BASE BID #5: WILSON & SOUTHPORT:Camosy Construction $763,565.00

Award

Educational

$3,775,628.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
123
Bidding Soon
1,914
All Active Projects
807
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

January 3, 2022

img_map_placeholder

811 Washington Rd, Kenosha, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.