Site work for a transportation facility in Concord, North Carolina. Completed plans call for site work for a runway / taxiway.

***As of January 25, 2022, the project has been awarded for the amount of $221,616.93.*** Beginning Work and Street Closings: The Contractor is responsible for notifying the Concord Department of Transportation for any work where the number of travel lanes is reduced from normal conditions. The Contractor shall install advance warning signs for the Project. These signs shall be in place for one week before construction activity begins. The Contractor shall begin construction activity on a street on the scheduled date for the closing of the travel lane. Traffic Control Plan: The contractor shall prepare a proposal on the traffic control operations and present them to the City of Concord's Engineering department Construction Manager at least 48 hours before beginning work. Traffic control will be performed by the Contractor based upon the Traffic Control Special Provisions. The Traffic Control Special Provisions may refer to plan sheets for major work items or details, or both. All traffic control devices and procedures shall conform to the requirements of the current edition of the Federal Highway Administration (FHWA) Manual on Uniform Traffic Control Devices (MUTCD), the current edition of the North Carolina Department of Transportation (NCDOT) Supplement to the Manual on Uniform Traffic Control Devices for Streets and Highways, the NCDOT Roadway Standard Drawings and the current edition of the NCDOT Standard Specifications for Roads and Structures. The Contractor shall maintain the traffic control as described herein unless the Contractor submits an alternate traffic control plan to the Engineer and it is approved by the Engineer. The Engineer may direct the Contractor to modify the traffic control if, in the Engineer's opinion, traffic is not moving safely or efficiently. Traffic Control Phasing for this project shall be in accordance with the Traffic Control Plans. The Contractor shall adhere rigidly to these plans. The standards are the minimum required. Additional signs, cones, drums, barricades and warning devices may be used, but at no time will less than what is specified on the plans or in the standards be acceptable. Maintenance of Traffic: The Contractorshall maintain all travel lanesin accordance with the Traffic Control Plan sheets. In areas of drop-offs and low shoulders, the Contractor shall backfill up to the edge and elevation of the existing pavement. The Contractor will be required to maintain ingress and egress to all businesses and dwellings, and easy access to fire hydrants. The Contractor shall provide adequate drainage under driveways and within the Project area for the duration of the Project. The Contractor shall mark all hazards within the Project limits with well-maintained signs, barricades, warning and/or channelizing devices. Traffic Control Devices: The Contractor shall furnish, install, operate, relocate, maintain and remove all temporary traffic control devices necessary for controlling traffic in accordance with the Traffic Control Plans and standards. The Contractor shall notify Engineer regarding conflicting permanent signs. Only Concord Department of Transportation personnel shall install, remove or relocate any permanent signs within the right-of-way. All construction signs and barricades shall remain in place until the appropriate permanent signs and pavement markings are installed. Equipment and Material Storage: During periods of construction inactivity, all construction materials and equipment shall be stored by the Contractor. The right-of-way or temporary project easement may be used for this purpose, but equipment and materials must be placed safely 10 or more feet away from any open travel lane. It is recommended that all construction equipment and materials be stored on private property, which is posted against trespassing. It is the responsibility of the organization performing the work to obtain the permission to use a property for this purpose. Excavation and Trenches: Excavations and trenches that cannot be properly backfilled and patched prior to the end of the workday shall be secured.

Award

Transportation Terminals

$221,617.00

Public - City

Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
100
Bidding Soon
1,641
All Active Projects
677
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 1, 2021

April 4, 2022

img_map_placeholder

9000 Aviation Blvd NW, Concord, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.