Published November 18, 2021 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Wayne Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Wayne Township Municipal Authority is requesting proposals for all labor, material & equipment required for the repair / replacement of one (1) sanitary sewer pump station on Lundy's Lane in Wayne Township. The work will be performed under one (1) general contract. All responsible parties regularly engaged in the business of this nature, interested in submitting a bid to the Wayne Township Municipal Authorit 1. Install all required E&S measures, clearing and grubbing site as well as topsoiling, seeding and mulching all disturbed areas. 2. Complete all site excavation, fill, compaction, grading and the placement of the 8" of compacted 2A limestone subbase for the pad area and within the entire fenced in area. 3. Remove and replace all galvanized pipe encountered, which is estimated to be twelve feet (12'). 4. Provide and install six foot (6') fence, PVC wing slats (wind load and privacy factor of 90%) and 5' wide single swing gate as shown on the plans. 5. Remove everything within the existing wet well and provide and install new pumps, lift out base elbow, pump rails, PVC piping, discharge elbow, fittings, pressure transducer, high and low water backup floats, control wiring, stainless lift chain, stainless eye hook with kelium grip to hang all cables/cords/lift out chain and all supports and fasteners that are required inside the existing wet well. All pump cords and pressure transducer/float cable lengths shall account for the depth of the wet well to the NEMA 1/3R fiberglass junction box (Wet well depth plus 10'). 6. Remove everything within the existing dry well and provide and install new valves (check valves and ball/plug valves), flow meter and associated controls (ensure that flow meter can be tapped into SCADA system), interior piping, fittings and NEMA 1/3R fiberglass junction box. 7. Remove 1.25" force main between wet well and meter/valve vault and replace with 2" S80 PVC pipe. 8. Provide all approved conduit, cables and control wiring between the service distribution panel board, control building, wet well and meter/valve vault. 9. Construct 8'x8' commercial shed to house control paneling as well as pouring concrete pad for shed/generator. 10. Provide and install the generator, generator cooling air box, generator exhaust, automatic transfer switch, distribution panel, pump control panel, lighting, receptacles, switches and all conduit, cable, and control wiring as shown on the plans. 11. Provide adequate pumping capacity (bypass line) during the construction period. The method is to be of short duration and meet the approval of the engineer. 12. Coordinate all electrical work, so that it will be completed before final placement of limestone subbase and final restoration.

Bid Results

Water / Sewer

$175,901.00

Public - City

Site Work

8

21

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
148
Bidding Soon
1,315
All Active Projects
606
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2021

December 16, 2021

img_map_placeholder

Lundys Ln, Wayne Township, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Lundy's Lane Pump Station Repair & Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.