Site work for a water / sewer project in Spring, Texas. Completed plans call for site work for a water / sewer project.

As of March 23, 2022, project was awarded to Sterling Site Services, awarded amount is $903,421.50 https://www.hcfcd.org/Community/Press-Roompost=Groundbreaking+for+Two+Partnership+Projects+in+the+Cypress+Creek+Watershed Groundbreaking for Two Partnership Projects in the Cypress Creek Watershed Groundbreaking for Two Partnership Projects in the Cypress Creek Watershed Groundbreaking acknowledging the start of work on projects K120-00-E001 Harris County Municipal Utility District (MUD) 249 agreement and K120-03-00-E001 Z-02 Partnership with Harris County Water Control & Improvement District No. 110 and Harris County MUD 249 When: March 10, 2022 at 10 a.m. Where: K120-00-E001- Harris County MUD 249 site on the north side of Cypresswood and just west of Lemm Gulley, near the cell tower. 841 East Cypresswood Drive, Spring, Texas 77373 Background: K12-00-E001 Harris County MUD 249 is an agreement regarding a detention basin expansion project between MUD 249 and the Harris County Flood Control District. Construction recently started on this partnership project within the limits of Harris County Municipal Utility District No. 249 to build stormwater detention that will: Mitigate for future drainage improvements in existing subdivisions Provide flood risk reduction in the Cypress Creek watershed The project is being managed by Harris County MUD 249 and includes the construction of a stormwater detention basin on a 6.810-acre site near the junction of Lemm Gully K120-00-00 and its tributary Wunsche Gully K120-03-00, north of Cypresswood Drive between Interstate Highway 45 and the Hardy Toll Road. The basin is designed to take in and temporarily hold approximately 37 acre-feet, or more than 12 million gallons of stormwater during heavy rain events. The Flood Control District contributed approximately $777,000 in 2018 Bond funding toward the project, under Bond ID Z-02 for partnership projects. Harris County MUD 249 spent more than $610,000 to purchase the right-of-way from the Flood Control District and contributed nearly $165,000 toward design and construction, plus additional right-of-way. K120-03-00-E001 Z-02 Partnership with Harris County Water Control & Improvement District No. 110 and Harris County MUD 249 K120-03-00-E001 Z-02 Partnership with Harris County Water Control & Improvement District (HCWCID) No. 110 and Harris County MUD 249 project is a tri-party detention basin expansion project (Flood Control District, MUD 249 and WCID 110) which is about a 1/4 mile north of the first project. HCWCID 110 and Harris County MUD 249 each own a basin which are adjacent to each other, and each have a maintenance berm that they share. The purpose of the project is to remove the common berm to obtain additional volume in the combined detention basin for flooding reduction. The additional volume due to the project is 12.2 acre-feet which is approximately 3.9 million gallons. ____________________________________________ The deadline to ask questions is 11/12/2021 5:30 PM CST 1. The site location is 841 E Cypresswood Drive, Spring, Texas 77373. Work includes, but is not limited to, the following: clearing and grubbing of 68 acres; excavate, haul, and legal dispose spoil; demolition of existing structures; backslope interceptor (construction); construction of 18" broken concrete rip-rap; implementation of storm water pollution prevention; restoration and grass establishment. In addition, the successful Bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, age, or national origin. Effective January 1, 2016, pursuant to Texas Government Code 2252.908 (the "Interested Party Disclosure Act" or the "Act"), the OWNER may not award the contract to a bidder unless the bidder has provided to the OWNER a completed and signed TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the "TEC"). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC's website, assigned a certificate number, printed, signed, and provided to the OWNER. The TEC Form 1295 may accompany the bid or may be submitted separately but must be provided to the OWNER prior to the award of the contract. The OWNER reserves the right to reject any or all bids and to waive informalities in bidding. In case of ambiguity or lack of clearness in stating the prices in any bid, the OWNER reserves the right to consider the most advantageous construction thereof, or to reject the bid. The award will be made to the responsible bidder submitting the lowest acceptable bid. The OWNER shall evaluate bids based on total cost, CONTRACTOR experience with OWNER, CONTRACTOR experience with other entities, equipment, and deliverability within the project time, AND deliverability of the completed work. The CONTRACT will be awarded to any responsible person or persons that, in the Board's judgement, will be most advantageous to the District and result in the best and most economical completion of the District's proposed plants, improvements, facilities, works, equipment, and appliances.

Award

Water / Sewer

$903,422.00

Public - County

Site Work

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
64
Bidding Soon
2,760
All Active Projects
1,071
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.