BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Farmville, Virginia. Completed plans call for the addition of a 17,900-square-foot, two-story above grade educational facility; for the demolition of a educational facility; for the renovation of a 24,600-square-foot pre-engineered storage facility; and for site work for a educational facility.

As of September 27, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Project Description: The project is generally described as the renovation and expansion of an existing metal frame building. The scope includes demolishing an approximately 10,000 square foot pre-engineered metal building and constructing a two-story, approximately 17,900 square foot, administrative building in its place; an existing warehouse space, approximately 24,600 square feet, will be renovated including a full exterior replacement. In total, the project will consist of approximately 42,570 square feet of programmed space. A pole barn approximately 11,900 gross square feet, south of the existing warehouse, will be demolished. A Bid Bond is required. All Inquiries For Information Should Be Directed To: Deborah J. Cooper, Interim Director of Materiel Management & Purchasing at email materielmanagement@longwood.edu or fax (434) 395-2246 using the PREBID QUESTION FORM included herein. Questions are due by 12:00 Noon on July 25, 2022 Procedures for submitting a bid, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids. Withdrawal due to error in bid shall be permitted in accord with Section 9 of the Instructions to Bidders and 2.2-4330, Code of Virginia. The Owner reserves the right to reject any or all bids. Contractor registration is required in accordance with Section 54.1-1103 of the Code of Virginia. All executive branch agencies are directed to advance Executive Order 35, dated July 3, 2019. Copies of the Invitation for Bids documents, including the plans and the specifications, will also be available for inspection at the following locations: RRMM Architects, (504) 344-1212), 28 Church Avenue SW, Roanoke, VA 24011 Longwood University, (434) 395-2864, 201 High Street, McCorkle Hall, Room 117, Farmville, VA 23909

Post-Bid

Educational

$20,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
20
Bidding Soon
582
All Active Projects
225
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2022

October 10, 2022

img_map_placeholder

201 High St, Farmville, VA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.