Site work and new construction of an educational facility in Orlando, Florida. Design plans call for the construction of a educational facility; and for site work for a educational facility.

As of September 13, 2022, information regarding award and award date has not been disclosed. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: Major elements of the project include: 1. A new multi-story elementary school prototype adapted for use at two new school campuses, each on an approximately 13 - 15 acre site and providing approximately 837 student stations for Pre-Kindergarten - 5th grade educational programs with progressive approaches to: a. 21st Century Learning environment fundamentals. b. Safety and security. c. Classroom/extended learning/learning commons. d. Health, wellness and sustainability. e. Teaching methods and practices, advanced building design, industrialized construction techniques, inclusion of state of the art technology and building flexibility/adaptability. 2. Facilities and site amenities meeting Owner design guideline and program requirements, as said requirements may be modified through the design process. 3. Site improvements, including but not limited to grading, drainage, retaining walls, underground utilities, storm water retention, etc. required in support of the new facilities. 4. Off-site improvements which may include but are not limited to an adjacent frontage roadway, turn lanes, driveways and underground utilities. 5. Educational Specifications for an approximate 837 student station Elementary School. In addition to the required services outlined in the Contract, the consultant will be tasked to provide a life cycle cost analysis of multiple alternatives to the District's standard design requirements for various building systems. Designs must comply with the Department of Education cost per student station limits. The estimated construction cost is approximately $22,000,000 for Site 47-E-W-4 and $23,000,000 for Site 97-E-SE-2, for a total construction cost of $45,000,000. Target Schedule: Design/Pre-construction Services Commencement: January 2022 Construction Notice to Proceed Date: April 2023 Substantial Completion: May 2024 The method of contractor selection has not been determined at this time.

Design

Educational

$30,000,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
90
Bidding Soon
1,317
All Active Projects
527
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

img_map_placeholder

Multiple Locations, Orlando, FL

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.