BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of an educational facility in San Leandro, California. Completed plans call for the construction of a 25,124-square-foot educational facility; and for site work for a educational facility.

Mandatory Pre-Response Meeting and Site Visit 10:00 A.M., November 18, 2021 Prequalification Questionnaires Due 2:00 P.M., November 23, 2021 District Notification of Prequalification Status 4:00 P.M., November 29, 2021 Questions Due 2:00 P.M., December 10, 2021 Responses Due 4:00 P.M., December 21, 2022 Interviews To be scheduled in early January 2022 Scope of Work Consists of: Design and construct a new 25,124 SF continuation high school campus; Multi-purpose room, administration wing, kitchen, (12) standard classrooms, Science Lab, Fabrication Lab, life skills classroom, staff and student restrooms, accessible playground areas, associated utilities, demolition, start-up, commissioning, and all other associated work required to provide a complete turnkey project at the new Lincoln High School site. Per the design development drawings, specifications, District Standards, DSA requirements, and all other state and local codes and requirements, required for a complete project. Construction Schedule: Start - May 2022 Complete - August 2023 Project Labor Agreement (PLA) MEPS scopes will be design build by the Subcontractor, you will carry the design and engineer of record. MEP trades need to be prequalified in order to be awarded the project. Submit your prequalificaiton (found in the MEP Prequalification folder under "files" tab) to the district by time of bid. Disabled Veteran Business Enterprises (DVBE) Subcontractor and Supplier Participation Is Encouraged.

Post-Bid

Educational

$20,000,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
459
Active Projects
231
Bidding Soon
3,320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

May 20, 2022

Project location map

Leonard Dr, San Leandro, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.