BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Waterbury, Connecticut. Completed plans call for site work for a playground / park / athletic field.

CLARIFICATION DEADLINE 12/13/2021 2:00 PM All questions and communications about this RFP and Proposal submission requirements must be submitted to and received in writing, via electronically by 2:00 PM November 18, 2021. Written clarifications or interpretations, as well as any changes or amendments to this RFP, may be issued by Addenda electronically by 2:00 PM on November 23, 2021. It shall be the responsibility of the Proposer to download this information. If you have any procedural questions in this regard, please call the Purchasing Director, Mr. McCaffery, at (203) 574-6748. The Project consists of all Work, Services and Items required and necessary for the demolition of the existing splash pad and construction of a completely new splash pad system, in place, as shown on the Contract Drawings. Work shall include but is not limited to preparation of the base for the new concrete slab; placement of the new concrete pad; installation of spray system and water supply system with connection to existing water line, backflow prevention device, distribution manifold and solenoid and manual valves; rebuild center drain; install electrical control system including connection to power supply, spray system control panel, and activation bollards; all bonding, grounding, and equipotential wiring in deck and equipment as required by local, state and national electric codes, and all related or appurtenant work incidental to or necessary to provide a fully functional and operating spray pad. 1. Demolish, remove and properly dispose of existing bituminous splash pad and appurtenances. 2. Layout proposed splash pad and notify CBYD. 3. Install spray features and associated plumbing. 4. Place and finish concrete splash pad including rebuilding center drain with ADA compliant grate. 5. Connect to existing water line and install backflow preventer, control valves, water meter yoke in new cabinet on concrete pad. 6. Install new control panel in existing building and furnish new signal wire from control panel to solenoid valves. Install PVC conduit where existing conduit is incomplete between building and new valve cabinet including all trenching and backfilling. Penetrate and seal building walls as necessary. 7. Install new outdoor furnishings. 8. Clean and restore work area after completion of work. 9. All labor, services, equipment, materials, supplies, transportation, and incidentals necessary to complete the Projec

Post-Bid

Swimming Pools

$500,000.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
387
Active Projects
157
Bidding Soon
4,126
All Active Projects
1,610
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

January 20, 2022

img_map_placeholder

215 Anna Ave, Waterbury, CT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.