BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Oakland Park, Florida. Completed plans call for the renovation of a water / sewer project.

This quote is for removal of existing floor covering at specified areas of Fiveash WTP and replacement with VCT (Vinyl Composition Tiles). Removing 5000 Sq. Ft. (Approx.) of existing floor covering (VCT, vinyl sheets, carpeting) from specified areas. Install 5000 Sq. Ft. (Approx.) of STANDARD VINYL COMPOSITION TILE (VCT). Tiles shall be 12"x12"x.125" (1/8") thick uniform in size; with edges cut accurately and square. Install 1400 LF (Approx.) of VINYL BASEBOARD MOULDING (Cove Base) Colors and patterns shall be selected from the manufacturer's color palette for Standard VCT from Armstrong or like manufacturer. Dryback installation per manufacturer's recommendation. Samples: Provide samples of each type of flooring material and accessory in manufacturer's range of colors and patterns for each grade indicated as requested. Manufacturer's Literature: Include descriptive information, installation, maintenance and cleaning instructions for each type of material specified as requested. Primer and Adhesive: Provide specifications data and MSDS information for the type and brand that shall be used for installation of VCT and Cove Base, and which is recommended by floor covering manufacturer for the specific application, as requested. Materials shall be allowed to reach and maintain the same temperature as the work area at least 48 hours prior to installation. Fit flooring material neatly and tightly into breaks and recesses, against bases, around pipes and penetrations, under saddles or thresholds, and around permanent cabinets and equipment. Comply with the flooring manufacturer's written installation instructions. Roll tile with a 100 lb. roller if recommended by the flooring manufacturer. Provide reducers/transition at junctions of flooring materials of differing thickness in order to provide a smooth transition. Upon completion of the installation of floor covering, adjacent work, and after materials have set, sweep or vacuum thoroughly to remove all lose dust and dirt. Damp mop the floor with a neutral cleaner as recommended by the manufacturer. Work Excluded: Furniture and movable items will be moved room to room by Fiveash staff to facilitate installation. Contract duration: 120 days Q & A deadline: Nov 24, 2021 2:00:00 PM EST no trade is available for Renovation Severity.

Award

Water / Sewer

$34,750.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
50
Bidding Soon
1,118
All Active Projects
502
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2021

December 30, 2021

img_map_placeholder

949 NW 38th St, Oakland Park, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.