Renovation of an educational facility in Kings Mountain, North Carolina. Completed plans call for the renovation of a two-story above grade educational facility.

**As of December 9, 2021, project will rebid. Bids will be received for a Single Prime Contract. All proposals shall be lump sum Cleveland County Schools reserves the unqualified right to reject any and all proposals. furnishing of labor, material and equipment entering into the construction of 1) 2 Story Stand Alone Classroom Building - Exterior wall transition to roof deck air sealing. 2) Main Building Top Floor - Exterior wall transition to roof deck air sealing. 3) Small Gym - Exterior wall transition to roof deck air sealing. 4) Ground Floor Side Entrance - Exterior wall transition to floor air sealing. 5) Passive High Wall Vents - Blocking and air sealing the vents. 6) Vocational Building - Exterior wall transition to roof deck air sealing. 7) Auditorium - Blocking and air sealing the soffit overhangs above the exterior doors. 1. 2 Story Stand Alone Classroom Building - Exterior wall transition to roof deck air sealing (red line): A. Air seal the top of the CMU block wall to the underside of the metal structural decking with closed cell foam, fill top cell of CMU if needed. B. Air seal completely around all structural penetrations with closed cell foam including between parallel flanges of metal beams that pass over the wall. C. Air seal around any electrical conduit or other penetrations observed through the exterior CMU block wall above the suspended ceiling with closed cell spray foam. D. All exposed areas air sealed with closed cell spray foam shall be coated with ignition/thermal barrier as required by the NC Building Code. 2. Main Building Top Floor - Exterior wall transition to roof deck air sealing (green line): A. Air seal the top of the CMU block wall to the underside of the metal structural decking with closed cell foam, fill top cell of CMU if needed. B. Some areas will require a backing material as the metal structural deck was cut back to allow for the sloped asphalt shingle roof installation. C. Air seal completely around all structural penetrations with closed cell foam including between parallel flanges of metal beams that pass over the wall. D. Air seal around any electrical conduit or other penetrations observed through the exterior CMU block wall above the suspended ceiling with closed cell spray foam. E. All exposed areas air sealed with closed cell spray foam shall be coated with ignition/thermal barrier as required by the NC Building Code. 3. Small Gym - Exterior wall transition to roof deck air sealing (blue line): A. Air seal the top of the CMU block wall to the underside of the roof deck with closed cell foam, fill top cell of CMU if needed. B. Air seal completely around all structural penetrations with closed cell foam including between parallel flanges of metal beams that pass over the wall. C. Air seal around any electrical conduit or other penetrations observed through the exterior CMU block wall with closed cell spray foam or appropriate sealant. D. All exposed areas air sealed with closed cell spray foam shall be coated with ignition/thermal barrier as required by the NC Building Code. 4. Ground Floor Side Entrance - Exterior wall transition to floor air sealing (green line): A. Air seal the top of the CMU block wall to the underside of the floor with closed cell foam, fill top cell of CMU if needed. B. Air seal completely around all structural penetrations with closed cell foam including between parallel flanges of metal beams that pass over the wall. C. Air seal around any electrical conduit or other penetrations observed through the exterior CMU block wall above the suspended ceiling with closed cell spray foam. D. All exposed areas air sealed with closed cell spray foam shall be coated with ignition/thermal barrier as required by the NC Building Code. 5. Passive High Wall Vents - Blocking and air sealing the vents (purple line): A. Multiple vents (approximately 1 ft by 0.5 ft) penetrate the high wall area. These vents should be blocked from the interior of the building at the CMU block wall with 2-inch foil-faced Thermax board to insulate and block the openings. Use closed cell fire foam to air seal the perimeter and all seams in the Thermax board to create an air tight system. 6. Vocational Building - Exterior wall transition to roof deck air sealing (yellow line): A. Air seal the top of the CMU block wall to the underside of the floor with closed cell foam, fill top cell of CMU if needed. B. Air seal completely around all structural penetrations with closed cell foam including between parallel flanges of metal beams that pass over the wall. C. Air seal around any electrical conduit or other penetrations observed through the exterior CMU block wall above the suspended ceiling with closed cell spray foam. D. All exposed areas air sealed with closed cell spray foam shall be coated with ignition/thermal barrier as required by the NC Building Code. 7. Auditorium - Blocking and air sealing the soffit overhangs above the exterior doors (orange line) A. Install 2-inch foil-faced Thermax board to insulate and block the opening above the exterior doors to the soffit overhang. Use closed cell fire foam to air seal the perimeter and all seams in the Thermax board to create an air tight system.

Post-Bid

Educational

$160,000.00

Public - County

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
65
Bidding Soon
1,153
All Active Projects
498
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2022

May 30, 2022

img_map_placeholder

500 Phifer Rd, Kings Mountain, NC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.