Published June 4, 2026 at 8:00 PM

Updated June 11, 2026

Demolition, site work and new construction of a detention facility in Anoka, Minnesota. Design plans call for the demolition of a detention facility; for the construction of a 263,000-square-foot, 540-bed detention facility; and for site work for a detention facility.

In 2018, an internal work group was formed, and the National Institute of Corrections was engaged to do a Jail and Justice System Assessment. The resulting report was provided in January of 2020. Based on this report, the County's jail facility is facing capacity issues and a variety of functional deficiencies. The Board has decided on a preliminary site plan and amended the contract with an architecture firm to being the schematic design phase of the project. This project may be halted at any point but continues to move forward. Initial estimates place the replacement of the Jail close to $234 million. The preliminary design to to begin 2027. It is anticipated final design will be completed later 2027 or early 2028. Construction then would start in 2028 and finishing by the end of 2029. The county anticipates to issued debt to fund the project in 2027-2028. The project's final cost has not been determined and the schedule can change at any time. As more information is discovered the budget will be updated to reflect changes. This is all subject to the board approval. Project is included in Anoka County Fiscal Year 2026-2030. As of June 02, 2026 , further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Jails / Prisons

$234,346,787.00

Public - County

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
109
Bidding Soon
2,062
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2028

Project location map

325 Jackson St, Anoka, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.