BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Palm Springs, California. Completed plans call for site work for a water / sewer project.

The Work comprises the of all materials, labor, tools, equipment, apparatus, facilities, transportation, incidentals necessary to furnish, all implied requirements, and all appurtenant work as required to remove existing 235' of chain link fence, installation of a new 10' x 235' CMU wall, landscape improvements, re-routing of existing underground 4" reclaimed water line, installation of restrain joints and thrust blocks, installation of trench drain, re-grading of landscape including the addition of a retention basin, adjustments to remaining chain link fencing as it relates to new block wall along the south end of the Demuth Park pickle ball courts, and all other work as described on the plans and specifications. The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder, on the basis of the total sum of the Base Bid Schedule, and reject all other bids, as it may best serve the interest of the City. If there are multiple and/or alternative Bid Schedules, Bidders are required to complete and submit a bid on all Bid Schedules and complete the Basis of Award. Bid Security each bid shall be accompanied by a certified or cashier's check or Bid Bond in the amount of 10 percent of the total bid price payable to the City of Palm Springs. As a condition of award, the successful bidder will be required to submit payment and performance bonds and insurance. Questions submitted after 3:00pm on December 7, 2021, will not be accepted. The Engineer's estimate is $250,000 to $300,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work shall be diligently prosecuted to completion before the expiration of: 90 working days. As a condition of the Citys acceptance of the Work, the Performance Bond shall be replaced with a Warranty Bond in the amount of 25 percent of the final Contract Price

Bid Results

Water / Sewer

$231,617.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
56
Bidding Soon
950
All Active Projects
399
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

January 13, 2022

img_map_placeholder

4375 E Mesquite Ave, Palm Springs, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.