Site work for a water / sewer project in Brighton, Colorado. Completed plans call for site work for a water / sewer project.

The City of Brighton (City) is seeking professional services for the design/build of an interconnection with South Adams County Water and Sanitation District (SACWSD). The City is looking to obtain water from SACWSD. This water will be provided to the City through the SACWSD distribution system. The additional water will increase the available water for our residents. The City is looking for a design/build team that can design and construct the water line as well as all associated infrastructure. Question Acceptance Deadline 11/23/2021 12:00 PM EST Questions are submitted online No - Insurance Required - Bidder Prequalification/Preregistration Required - Contractors License Required - Warranty Information Required - Installation Required - License Required - Certification/Training - Safety Standards Plan The interconnect will be located at East 112th Ave. & Peoria Street. This would require coordination between the City and SACWSD to connect with the existing 12" SACWSD water main located at E. 112th Ave. & Peoria St; approximately 5,400 LF of pipeline will need to be installed from 112th Ave. to 120th Ave. on Peoria St. to tie into the City's existing 24" PVC transmission main at the intersection. See attached map, Exhibit "A," for Interconnect placement. Items to be considered in design and construction scope shall include, but are not limited to: Vault at connection point to house backflow, meter, flow regulator, chlorine injection, booster pump Approximately 5,400LF of 12" pipe Disconnect and abandon existing service lines off SACWSD main and transfer services to new City main Installation of all valves, restraints, hydrants, etc. per City Standards and Specifications Mobilization, reclamation and restoration, traffic control, and material testing and reporting are to be considered inherent items to the work.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
93
Bidding Soon
1,280
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

January 19, 2022

Project location map

Multiple Locations, Brighton, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.