BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in New Braunfels, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

https://herald-zeitung.com/community_alert/article_705fe7fc-d30c-11ec-ae0e-0bb743415cea.html A New Braunfels Utilities contractor has begun work on a nearly $5.5 million improvement project that will add needed pumping and transmission capacity when completed in December. The Grandview Pump Station capital improvement project includes replacing about 1,800 linear feet of water main between NBU's Well No. 4 and the Grandview Ground Storage Tank and Pump Station site from a 12-inch line to a 16-inch line. The larger water main will increase transmission capacity between these two facilities to allow Well No. 4 to pump directly and entirely to the Grandview Ground Storage Tank. The project also includes the addition of a third pump at the Grandview Pump Station, increasing the firm pumping capacity of the facility from 2,400 gallons per minute to 4,000 GPM, which matches the production capacity of the well. NBU will also upgrade about 2,850 linear feet of water main along Walnut Avenue and Loop 337 by increasing the current 16-inch water line to a 24-inch water line between the Grandview site and the existing 24-inch line at Loop 337. "The water main upsizing will allow all 4,000 GPM to be pumped into and utilized within NBU's Kerlick, Westpointe, Mission and Copper Ridge pressure zones," said Chief Water Engineer Shawn Schorn. The Well No. 4 to Grandview Water Main is just one of 77 water and sewer projects that NBU has in the pipeline to improve its system. As a part of the project, Pesado Construction Company has begun rock sawing trench lines and will continue until late August. The rock sawing requires a partial lane closure on the Loop 337 Frontage Road near H-E-B. Through traffic will be able to utilize the partial lane for the duration of construction. Additionally, there will be lane closures on Kerlick, adjacent to State highway 46, until August. However, two-way traffic will be maintained. Once rock sawing has begun, crews will start the open-cut installation of the water mains in June and will continue for the project's duration. "We understand this work will inconvenience many drivers in the Loop 337 Frontage Road/SH 46 and Walnut Avenue/Kerlick Lane areas and apologize for this disruption," Schorn said. "This project is part of our master plan to help ensure that the residents of New Braunfels continue to have reliable access to water for the foreseeable future, and we intend to work as quickly as possible to complete it on time and on budget." __________________ New Braunfels Utilities ("NBU") is soliciting Request for Bids ("RFB") for water utility construction services.

Under Construction

Water / Sewer

$4,561,611.00

Public - City

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
145
Bidding Soon
3,530
All Active Projects
1,387
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 30, 2021

January 31, 2022

September 28, 2022

img_map_placeholder

Multiple Locations, New Braunfels, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.