BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2022 at 7:00 PM

Updated November 14, 2023

Site work for a mixed-use development in San Antonio, Texas. Completed plans call for site work for a playground / park / athletic field.

**As of January 25, 2022, the project has not yet been awarded. A timeline for award has not yet been established.** The Project is generally described as follows: Provide shade structures at the upper and lower-level playgrounds at 40 elementary schools and general site work as indicated on the drawings and specifications to include all general construction, site work, heating, air conditioning, electrical, plumbing and all other work as indicated on the construction documents. The Project must be complete and ready for occupancy not later than October 12, 2022 assuming that the successful Offeror is given notice of its top ranking on or before January 19, 2022. Any proposal must provide for final completion by this date. The Notice to Proceed may be issued up to eighty-eight (88) consecutive calendar days following the Notice of Award. The Contractor shall take this period into account in the preparation of its Proposal. No claim for additional time shall be considered unless this period is exceeded. Alternately, Offerors may be asked to submit the number of calendar days required for completion of the Work, if completion of the Work shall be prior to such date. Each proposal must be accompanied by proposal security in the amount of five percent (5%) of the total proposal, including all additive alternatives, pledging that the successful Offeror will, within 30 calendar days after the successful Offeror is notified of receipt of its proposal, enter into a written contract with the Owner on the terms stated in the "Proposal Documents", as evidenced by the unconditional execution and delivery of such contract, and furnish payment and performance bonds, evidence of insurance and other submittals as required by the "Proposal Documents". Should the successful Offeror fail or refuse to enter into such contract or furnish such bonds or evidence of insurance within the time abovestated, such proposal security shall be forfeited to the Owner as damages, not as a penalty. Such proposal security shall be in the form of cash, certified funds payable to the order of the Owner, or a bond in favor of the Owner. The bond shall be on AIA Document A310 "2010 Edition," and shall be issued by a corporate surety duly authorized and admitted to do business in the State of Texas, and licensed by the State of Texas to issue surety bonds and to be an executed original. If the amount of the bond exceeds the legal underwriting limitation of the surety, the Offeror and the surety shall provide the Owner with evidence that the excess is reinsured with one or more reinsurers who are duly authorized, accredited, and licensed to do business in the State of Texas. Any proposal which is not accompanied with proposal security in the form and amount required herein shall be rejected as nonconforming. The Owner shall have the right to retain the security of all Offerors to whom an award is being considered until either (i) the Contract has been unconditionally executed and delivered by the parties and any required payment and performance bonds, evidence of insurance and other submittals have been furnished, or (ii) all proposals have been rejected by the Owner without the acceptance of any proposal.

Award

Playgrounds / Parks / Athletic Fields

$2,900,000.00

Public - County

Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
70
Bidding Soon
2,197
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2022

March 7, 2022

Project location map

Multiple Locations, San Antonio, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.