Site work and renovation of a water / sewer project in Sherbrooke, Quebec. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Reference number : 1542499 Deadline for receipt of complaints: 2021-11-22 Electronic submission accepted: Non The City of Sherbrooke is requesting bids for electrical and mechanical building upgrades for the Hertel sewer pumping station. The work of this project consists of the complete replacement of the ventilation equipment and the main electrical distribution of the Hertel pumping station in Sherbrooke. This position has been in operation since 1976, the main electrical distribution equipment has reached its useful life and must be replaced. Among this equipment, the main distribution panel, the motor control center and the soft starters are to be replaced. As this nerve center must be kept functional during the work, a large temporary power system must be installed and operated during the work. Finally, the project also includes certain building mechanics work for the replacement of fans and certain ventilation controls . More specifically, the modification works provide for the following interventions for each of the disciplines: Building mechanics - Ventilation work: Carry out the demolition of the existing ventilation systems. Provide for the supply of new air supply, air distribution and exhaust equipment and achieve thermal insulation. Carry out the balancing and commissioning of the equipment. Electricity - Temporary work Take the steps with Hydro-Sherbrooke for the connection request for the required temporary installation, including all the resulting steps necessary to carry out the work. Supply, install and connect all temporary equipment according to the installation details in the plans and phasing of the proposed work. The contractor can propose alternatives according to the site conditions in order to minimize the interruptions of services. Coordinate and plan all required service interruptions with the City of Sherbrooke (day, night and / or weekend, as the case may be). Carry out the tests and start-up. Ensure the proper functioning of temporary equipment on the regular and emergency network for the entire duration of the work. Check the operation in coordination with the operator and the programmer of the pumping station (Ville de Sherbrooke). The temporary service must be able to maintain the building services while allowing the continuity of alternating service of two of the four 250 HP pumps of the pumping station. If necessary, provide for the dismantling and patching of an existing portion of the wall to allow the passage of equipment according to the indications on the plans. At the end of the work, remove the temporary equipment and repair the openings made for the passage of cables. Restore the premises as before the work was carried out. Power, distribution and control electricity - Installation of new equipment: Carry out the work declaration with Hydro-Sherbrooke for the connection request for the new installation, including all the resulting steps necessary to carry out the work. Carry out equipment lockout and dismantling work in coordination with the pre-established temporary work sequence. Supply, install and connect all the electrical equipment specified in the plans for the completion of the works and the updating of the existing electrical distribution. Supply and install a network of horizontal cable trays and / or a network of conduits according to the indications on the plans to connect the various distribution panels, the new distribution station, the motor control center, the PLC control panel and the equipment. Provide all the required wiring between these equipments. Make the connections at each end. Identify all the cables installed and list the starting point and the end point of the cable. Update the identification in the City documents at the end of the work. Coordinate the work with the various trades, the manufacturer and the City for the physical installation of the equipment and the proper functioning of the systems. Carry out inspections, tests and start-up of all systems on the regular and emergency network. Submit the results of the tests in the end-of-work documents. Carry out and hand in the short-circuit, protection coordination and electric arc study. Submit all end-of-work documents including the as-built plans.
Bid Results
Water / Sewer
$594,421.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 21, 2021
January 10, 2022
To Be Determined, Sherbrooke, QC
Related To This Project
Sherbrooke, QC
Bid Date: Aug 05 2021
Sherbrooke, QC
Bid Date: Nov 22 2021
Sherbrooke, QC
Bid Date: Dec 21 2021
Sherbrooke, QC
--
Sherbrooke, QC
--
Sherbrooke, QC
Bid Date: Jan 28 2022
Sherbrooke, QC
--
Sherbrooke, QC
Bid Date: Jan 26 2022
Sherbrooke, QC
Bid Date: Apr 23 2021
Sherbrooke, QC
Bid Date: Jul 06 2021
Sherbrooke, QC
Bid Date: Dec 02 2021
Sherbrooke, QC
Bid Date: Sep 03 2021
Sherbrooke, QC
Bid Date: Sep 02 2021
Sherbrooke, QC
Bid Date: Sep 07 2021
Sherbrooke, QC
Bid Date: Jul 15 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.