BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Newton Township, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of August 29, 2023, this project has been awarded to a contractor. *The closed solicitation has been included below for reference: The following rating factors will be used by Pike County Engineer to evaluate each statement of qualifications. All rating factors will have equal relative importance. Please respond only to the questions listed. We request that you do not send additional forms, brochures, or similar material. 1. List the type of work for which your firm is currently prequalified by the the Ohio Department of Transportation. 2. Detail the project staffing, broken down by the number of: a. Professional Engineers b. Technicians c. Other Specialists Also indicate the number of such personnel available for assignment to this project. 3. List the project manager(s). Attach resume(s). 4. List the experience of your firm's personnel on similar projects. 5. Provide a representative listing of projects similar to the proposed project performed by your firm. Include number of years your firm as been in business. 6. List your firm's present workload. Please specify the dollar value of PRESENT OUTSTANDING fee agreements. 7. Provide references. 8. Provide a brief description of your firm's equipment and facilities. Statements of qualifications should be transmitted to The Board of Pike County Commissioners c/o Denny T. Salisbury, P.E., P.S., Pike County Engineer, 502 Pike Street, Waverly, Ohio 45690. As required by Ohio Revised Code, Section 153.65-71, responding firms will be evaluated and ranked in order based upon their qualifications. Following this evaluation, the Board of Pike County Commissioners will enter into contract negotiations with the most highly rated firm. The preliminary project description is as follows: Name of Project: Long Fork Road Slip Repair Project, PIK-CR26- 00.72 Location: Long Fork Road, Newton Township, Pike County, Ohio Description: Design Services utilizing the Geohazard Exploration Report as prepared by Terracon for this project. If subconsultants are to be utilized by the Prime Consultant, the Prime Consultant is required to take at least the following five affirmative action steps: 1. Place qualified small and minority businesses and women's business enterprises on solicitation lists. 2. Assure that small and minority businesses and women's business enterprises are solicited whenever they are potential sources. 3. Divide total requirements, when economically feasible, into smaller smaller tasks or quantities to permit maximum participation by small and minority businesses and women's business enterprises. 4. Establish delivery schedules, where the requirement permits, which encourage participation by small and minority businesses and women's business enterprises. 5. Use the services and assistance, as appropriate, of such organizations as the Small Business Administration (SBA) and Minority Business Development Agency of the Department of Commerce (DOC). Project Schedule: Complete all work 6 months from Notice to Proceed

Award

Roads / Highways

$335,715.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
46
Bidding Soon
1,094
All Active Projects
466
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

img_map_placeholder

Long Fork Rd, Newton Township, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.