Site work and asbestos abatement for a residential development in Pontiac, Illinois. Completed plans call for site work for a residential development; and for asbestos abatement for a residential development.

Project Locations: - All Locations are within the City of Pontiac, IL 708 W. Washington Street 712 W. Washington Street 632 S. Locust Street 302 East Polk Street 213 East Payson Street 314 Main Street (Asbestos & Mold Mitigation) By submitting a bid, the Contractor acknowledges that they are an Illinois Department of Public Health Licensed Asbestos Abatement Contractor and that they have investigated and satisfied themselves as to the conditions affecting the work. These conditions include but are not limited to: physical conditions or operations of the site that may bear upon site access, handling and storage of tools and materials, access to water, electric, or other utilities, or other considerations which may affect performance of required activities. Any failure by the Contractor to acquaint himself with available information will not relieve him from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The Building Owner is not responsible for any conclusions or interpretations made by the Contractor on the basis of the information made available by the Building Owner. The Contractor shall purchase and maintain insurance that will protect The Contractor and the City from claims that may arise out of or result from his activities under this Contract, whether those activities are performed by himself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. Contractor shall state its minimum insurance coverage in its bid submittal. Pursuant to the Invitation to Bid, the undersigned offers to furnish all labor, materials and services necessary to complete the project of the Owner in strict accordance with all applicable laws and other Contract Documents describing said project for the sum(s) set forth in Section L below. In the event that the Owner accepts this bid, the undersigned agrees to furnish all insurance required by the Contract Documents, to enter into and execute an agreement with the Owner containing all the terms, conditions, specifications and other provisions set forth in the Contract Documents, and to accomplish and complete the work in accordance with the Contract Documents. Not later than forty-five (45) days following the submission of the application for payment, the City shall pay the Contractor for the work contained in the application which has been found by the City to have been actually performed less ten percent (10%) of such amount which shall be retained until final payment. Illinois Prevailing Wage & Certified Payroll required. This is a public works project and subject to Livingston County Prevailing Wage which may be found at website. . Bid Submittals: In addition to completion of this form, contractor shall provide: o 100% Payment Bond for the project o Insurance information including carrier, policy type, rating, and limits of coverage The Contractor shall supply all labor, materials, services, insurance, permits and equipment necessary to carry out the work in accordance with all applicable Federal, State, and Local regulations. Bidder certifies that bid is genuine and not collusive or sham; that said bidder has not colluded, conspired, connived or agreed directly or indirectly with any bidder or person to put in a sham bid or to refrain from bidding; and has not in any manner directly or indirectly sought by agreement or collusion or communication or conference with any person to fix the bid price element of said bid or that of any other bidder; or to secure any advantage against any other bidder or any person interested in the proposed contract. The project is to be performed/completed in the following sequence/schedule to accommodate the subsequent demolition schedule: All work shall commence after receipt of Notice to Proceed (NTP), anticipated March, 2022. Work shall be completed by Abatement Contractor no later than 60 days after NTP, 10 -day IEPA notice and 50 working days. Work not completed by these dates will be subject to a stipulated penalty of $500 per calendar day. Work completion is defined as abatement completed, ACM/mold waste properly disposed, acceptable clearance results, and equipment demobilized. The contractor shall complete the following scope of work in accordance with applicable, local, state, and federal regulations. Scope of work shall include all abatement and mitigation of areas listed on the attached August 12, 2020, August 18, 2020, July 2021, and October 2021 reports. The contractor, prior to furnishing bids shall determine exact locations and quantities. Contractors are responsible for actual quantities present at the facility even if not identified on documents provided to Contractor. This is a LUMP SUM payment for removal of ACM and mold mitigation for purposes of demolition or renovation. Contractor shall provide: o 10-day IEPA Notice immediately after receiving notice to proceed. o Removal and disposal of asbestos containing materials identified within the Asbestos Building Inspection Reports along with any other similar ACM materials throughout the facility and other materials that may become contaminated and/or cannot be adequately cleaned near asbestos containing materials. o Clean and removal/disposal of mold growth identified within the Diagnostic Assessment and Environmental Sampling of 314 North Main Street, Pontiac, IL along with any other similar mold growth throughout the facility and other materials that may become contaminated and/or cannot be adequately cleaned near identified mold growth. Electric and Water service is not guaranteed at each property. NON-ACM debris not comingled or contaminated with ACM debris may be left inside the building in a non-regulated area and will be disposed by others during demolition. Written questions will be accepted until 4:00 pm on February 25, 2022, to gdeigan@deiganassociates.com. Questions will be answered in the form of an addendum issued to all bidders.

Award

Residential Subdivision

$49,145.00

Public - City

Asbestos Abatement, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
145
Bidding Soon
2,259
All Active Projects
1,015
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 3, 2022

April 4, 2022

img_map_placeholder

Multiple Locations, Pontiac, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.