EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 7, 2022 at 7:00 PM

Updated January 26, 2024

Renovation of a pre-engineered storage facility in Vallejo, California. Completed plans call for the renovation of a pre-engineered storage facility.

Replacement of the existing fire alarm and detection system throughout the existing Solids Processing Facility. The Solids Processing Facility consists of three levels: Ground Floor ~9,775 SF; 2nd Floor ~11,140 SF; and Mezzanine Level ~1,565 SF. The facility is constructed of concrete and consists of deep beam pockets. Existing conduit located within concrete wall and above hard ceilings will be reused. The new fire alarm and detection system shall be an addressable system designed, installed, and fully functional in compliance with all adopted codes and standards and AHJ approval. Completion: 180 calendar days License Required: C-10 / Dir Electrician Certification Questions concerning this project should be submitted in writing via email and directed to: Gustavo Gus Silva Ph. (707) 652-7809 Email: GusSilva@VallejoWastewater.org

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$529,000.00

Public - City

Renovation

11

9

2

8

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Closeout Submittals, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Central HVAC Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
90
Bidding Soon
1,993
All Active Projects
811
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

January 10, 2022

img_map_placeholder

450 Ryder St, Vallejo, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.