BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a service station / car wash facility in Farmington, New Mexico. Working plans call for the renovation of a service station / car wash facility.

The City of Farmington is seeking bids from Contractors to furnish all labor, equipment, and materials to install three (3) fuel polishing (filtration) systems at the City of Farmington Municipal Operations (MOC) bulk motor fuel facility. By submitting a bid, the Bidder indicates they have familiarized themselves with the conditions affecting the performance of the work and with the Contract Documents, including the Advertisement for Bids, Instruction to Bidders, Bid Proposal, Bid Bond, Agreement, Performance Bond, Labor, Material, and Tax Payment Bond, Notice of Award, Notice to Proceed, Conditions of Contract, Special Conditions, Drawings, Specifications and all Addenda thereto, as prepared by the City of Farmington, all of which are made a part hereof, hereby proposes, in accordance with said Contract Documents, to furnish all plans, equipment, labor, materials and supervision to perform the work summarized hereafter on each Bid Schedule upon which a proposal amount is inserted. The total bid for each Bid Schedule includes all work necessary to complete that portion of the project described in each Bid Schedule, and the total of all Bid Schedules represents the entire scope of work covered by the Contract Documents. If a particular item of work is not specifically separated as a bid item, the cost therefore shall be included in the bid item most nearly related. The total bid for each Bid Schedule is based on the quantities shown in this Bid Proposal and on the dimensions shown on the plans where specific quantities are not itemized. When Bid Schedules are based upon unit prices, the Contract Amount will be adjusted by change order at the corresponding unit prices according to the actual quantities and measurement of the finished construction as determined by the Field Engineer upon completion of construction. Supplemental unit prices may, when included in this Bid Proposal, be used as a basis to adjust the Contract Amount by change order should it become necessary, in the opinion of the Owner or Engineer, to add or deduct work not otherwise subject to adjustment by stipulated unit prices. Bidder further agrees to pay as liquidated damages in the amount of $0 for each consecutive calendar day thereafter that the work remains uncompleted. If awarded a contract, the undersigned Bidder agrees to substantially complete the work for final acceptance within Bulk Fuel Polishing Systems 60 calendar days after issuance of the Notice to Proceed The Bidder shall submit with their bid a bid bond (proposal guarantee) equal to 5% of the total amount bid. Subcontractor's Listing Threshold: The Bidder shall list each Subcontractor on the Contractor's List of Subcontractor's, Form AF-5, that has provided a bid to them in the amount of $5,000 or more. Question Cutoff Date 11/30/2021 04:00:00 PM (ET) 12/14/2021 8:00 PM (ET) : Recommendation of award for this solicitation is tentatively scheduled to go to City Council on this date. The City of Farmington reserves the right to change this date should it be in our best interest to do so. Subcontractor's Listing Threshold: The Bidder shall list each Subcontractor on the Contractor's List of Subcontractor's, Form AF-5, that has provided a bid to them in the amount of $5,000 or more. The bidder certifies that this bid is genuine and is not made in the interest of, or on the behalf of, any undisclosed person, firm, or corporation, and that this bid has been arrived at independently, without consultation, communication or agreement as to any matter related to this bid with any other Bidder or competitor. Estimated total project cost: $300,000.00

Final Planning

Service Station / Car Wash

$149,700.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
5
Bidding Soon
154
All Active Projects
56
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 7, 2021

January 27, 2022

img_map_placeholder

101 Browning Pkwy, Farmington, NM

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.