BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Gardner, Massachusetts. Completed plans call for the renovation of a municipal facility.

The project consists of the installation of a new service entrance rated distribution equipment, new retrofit panelboard interiors, modifications to the existing fire alarm system including a new fire alarm control panel, new devices, new egress lighting and exit signs and the removal of the existing panelboard interiors and existing central DC lighting system at the Gardner District Court in Gardner, MA. 1. Install new egress lighting and exit signs 2. Remove existing DC lighting system 3. Modify existing fire alarm system including the installation of new devices and equipment. 4. Remove and replace panelboard interiors 5. Remove and replace service entrance switchboard 6. Provide startup, testing, commissioning of all systems installed. 7. Provide owner training. The project work consists of a the installation of a new service entrance rated distribution equipment, new retrofit panelboard interiors, modifications to the existing fire alarm system including a new Fire Alarm control Panel, new devices, new egress lighting and exit signs, the removal of the existing service entrance distribution equipment, existing panelboard interiors, and an existing central DC lighting system. The project shall be constructed so as to meet all requirements of the Contract Documents, including, but not limited to, the plans and specifications for Massachusetts State Project TRC 2156 FT1 Electrical System Upgrades at the Gardner District Courthouse. B. General Project Information: Removal of the service entrance distribution equipment, existing panelboard interiors, and an existing central DC lighting system. Installation of a new service entrance rated distribution equipment, new retrofit panelboard interiors, modification to the existing fire alarm system including a new Fire Alarm Control Panel, new devices, new egress lighting and exit signs. Startup, testing, commissioning and training shall be provide for all new systems and equipment. A preconstruction Hazardous Building Material Assessment (HBMA) has been performed. Asbestos has been found in various floor tile and mastic. Architectural finishes scope of work includes but is not limited to the removal and reinstallation of various floor tile and carpet tiles, ceiling assemblies including suspended acoustical panel and concealed spline tile. Also included is the cutting and patching of gypsum board for wall and ceiling assemblies. All cutting and patching of finishes, or removal and reinstallation of floor carpet and tile, ceiling assemblies affecting existing wall finishes, shall be prepared and finished to receive new paint to match existing. Miscellaneous wood trim disrupted during the work shall be repaired or replaced to match existing and painted. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work is estimated to cost $749,000 MBE/WBE) participation goals for this are 4.2% MBE and 8.8% WBE. The applicable minority workforce utilization percentage is 15.3 %. The applicable women workforce utilization percentage is 6.9 %.

Bid Results

Municipal

$675,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
640
Active Projects
392
Bidding Soon
5,048
All Active Projects
2,026
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 30, 2021

December 30, 2021

June 30, 2022

img_map_placeholder

108 Matthews Rd, Gardner, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.