Site work for a bridge / tunnel in Northampton, Massachusetts. Completed plans call for site work for a bridge / tunnel.

As of August 11, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Install lighting under bicycle path bridge on Main Street, Northampton. The Work The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction. Questions: Wayne Feiden, Director of Planning & Sustainability WFeiden@NorthamptonMA.gov The Contractor under this section shall furnish all labor, materials, appliances and equipment necessary to perform all electrical work, complete in strict accordance with this section of the specifications and applicable drawings and subject to the terms and conditions of the contract. All equipment and materials shall be new. B. The work referred to under this division includes all labor, materials and equipment, rigging, and transportation for the satisfactory installation and completion of all work referred to herein and/or as may be shown on the contract drawings and not specifically mentioned in this division. C. The following schedule is part, but not necessarily all-inclusive, of the items in this division of the contract: 1. Furnish and install new electric service including Secondary system conduits and conductors from the pole, main panelboard, and new grounding system. 2. The owner will pay all utility company charges. 3. Furnish and install new main panel, SPD device, meter socket, and Circuit Breakers. 4. Furnish and install new Panelboards complete with Circuit Breakers. 5. Furnish and install new feeders and branch circuits. 6. Furnish and install new junction boxes and pull boxes. 7. Furnish and install new light fixtures, power supplies, controllers, gateways, etc. 8. Furnish and install new wiring devices, wall plates and branch circuit wiring. 9. Furnishing, installation and connections of all lighting fixtures and lamps, including contactors, time switches and other required control equipment as shown on the drawings. 10. Make final connections of power and/or control wiring as required by existing equipment. 11. Furnish and install new Data outlets with conduits and pull wires. 12. Furnish and install Heavy duty fused safety switches. Switches shall be Nema-1 for indoor applications and Nema-3R for outdoor applications. 13. Furnish and install a climate controlled NEMA 3R enclosure for the lighting controls. 14. Furnish and install a new NEMA 3R enclosure for the new main panel. 15. Provide all sleeves, hangers, supports, inserts, anchors, bolts, etc., required for the installation of this work 16. Calculations for lighting substitutions. Provide all required lighting calculations for review and approval by the engineer to conform with the basis of design. 17. Temporary light and power service, lighting outlets, lamps, receptacles, and wiring for construction lighting and power 18. Test of all electrically operated equipment. 19. Guarantee

Bid Results

Bridges / Tunnels

$183,017.00

Public - City

Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
540
Active Projects
315
Bidding Soon
4,288
All Active Projects
1,730
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 23, 2022

July 25, 2022

January 20, 2023

img_map_placeholder

Main St, Northampton, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.