BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 24, 2021 at 7:00 PM

Updated March 22, 2025

Site work for a pipeline in Statesville, North Carolina. Completed plans call for site work for a pipeline.

The last day for questions will be Tuesday, November 24, 2021 The project consists of furnishing and installing, complete, including labor, equipment, parts, materials, and other work incidental for the expansion of the existing landfill gas collection system at the Iredell County Solid Waste Municipal Landfill located at 354 Twin Oaks Road, Statesville, NC. The project includes the expansion, repair/replacement and abandonments of the existing landfill gas collection system in two waste filling areas consisting of Phases 1/2 & 3/4 and includes the installation of twenty-three (23) new vertical extraction gas wells, approximately 6,000 linear feet of below grade LFG, air and forcemain piping and related work. Optional work to be completed under Non-Routine Construction and Contingency items to include but not limited to regrading LFG header pipe, repairing cleanout and drainage connections among other tasks not specified in the scope that could arise during construction. All questions regarding the project must be directed in writing to Mr. Brock McNabb, P.E. (bmcnabb@cecenv.com) and David Sifford (david.sifford@co.iredell.nc.us) with a CC: to Mr. Teddy Boller (tboller@co.iredell.nc.us) and Mr. Ray Hoffman, P.E. (rhoffman@cecenv.com) and all answers will be made by addendum sent to all known bidders and published. To qualify, all bids shall be submitted using bid forms contained in the Contract Documents. Incomplete or segregated bids will not be accepted. All bids must be accompanied by a bid bond of no less than five percent (5%) of the total amount of the bid by the CONTRACTOR as guaranty that, if the bid is accepted, the Bidder will execute the Contract and deliver required Performance and Payment Bonds within the time provided in the Instructions to Bidders. Bids shall be valid for a period of no less than 90 days after submission; any bid withdrawal shall be limited and handled according to NC General Statute as set forth in the Instructions to Bidders. The OWNER reserves the right to accept alternates in any order or combination, to negotiate with the lowest responsive, responsible Bidder in any manner or form that is keeping with NC General Statutes and in the best interest of the OWNER. The OWNER reserves the right to accept or reject any or all bids and will exercise this right against any Bidder currently engaged in litigation against or a contractual dispute with the OWNER.

Post-Bid

Pipeline

$300,000.00

Public - County

Site Work

12

12

5

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
144
Bidding Soon
1,645
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2021

December 27, 2021

Project location map

354 Twin Oaks Rd, Statesville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.