Site work, renovation and addition to a detention facility in Belton, Texas. Completed plans call for the addition of a detention facility; and for the renovation of a detention facility.

Plans call for the construction of a new housing tower and multiple additions/renovations. o Area 1 - Bonds/Visitation/Court Additions and Renovations (Approximately 4,200 SF Additions, 9,500 SF Renovations) o Area 2 - 2-Story Administration and Intake Additions (Approximately 15,300 SF and 900 SF Additions) o Area 3 - Medical Addition and Renovations (Approximately 11,000 SF Additions, 10,400 SF Renovations) o Area 4 - Kitchen Renovations (Approximately 7,700 SF) o Areas 5-7 Existing Jail Modifications (The work in these sections is in Alternates 2, 3, 4, 5, and 6) o Area 8 - Existing Corridor Link (Alternate 2 security electronics upgrades only) o Area 10 - Multi-Story Inmate Housing Tower (Approximately 150,000 SF Elevated Concrete Structure) *Please note all furnished precast inmate cells, precast concrete wall panels, detention equipment/security electronics scopes have already been secured and are NOT being solicited as part of this package. There are six (6) bid ALTERNATES as follows: Alt 1 - Add two new chillers to remove the existing jail load off the Justice Center chillers Alt 2 - Add alternate to retrofit the existing electronic security system and add new electronic security system devices in existing areas (Area 2, 5, 6, 7, and 8) per documents and provide one (1) electronic security system that will fully integrate existing system and new electronic security system, including any other ancillary support. (conduit, data, ceiling/wall patch repair, etc.) Alt 3 - Add alternate to retrofit and renovate existing gang restrooms / showers located in Areas 5, 6, and 7 as shown on the documents. This work includes repainting of walls, recoat shower floor/walls/ceilings with new seamless shower system, replace all plumbing fixtures, install epoxy curbs at showers, install new epoxy floor/base, replace supply/exhaust grilles, add linear trench drains, replace lights, detention caulking at plumbing/lighting fixtures, and replace fire suppression heads. In addition to the work described above, this alternate also includes addition of new electronic valves and Sloan Programmed Water Technologies system for all penal plumbing fixtures located in Areas 2, 5, 6, and 7. Alt 4 - Add alternate to replace existing light fixtures at Areas 5, 6, and 7. Include all related detention caulking. This alternate does not include the light fixtures replaced as part of Alternate 3 (gang restrooms / showers). Alt 5 - Add alternate to repaint the existing jail housing (Areas 5, 6 and 7). This alternate does not include the repainting as part of Alternate 3 (gang restrooms / showers). Alt 6 - Add additional camera at Housing Tower cells beyond TCJS requirement. Includes all conduit, devises, equipment, and cabling. **Section 01 0001 BID FORM AND ALTERNATES provides a bid form to be utilized by all bidders. This form may be supplemented with each bidder's standard bid forms with any specific inclusions/exclusions but MUST be submitted with each proposal. The following documents are not currently found within the Project Manual but are provided under the "Other Documents" tab on iSqFt. Geotechnical Report, 004000-Criminal History Information Form and Release Information, and 009000-Hoisting Exhibit 2 (Tower Crane Foundation Design). These will be formally added via upcoming Addendum. All pre-bid questions for this project are due by May 17, 2022 and should be directed to David Ritz at bids@sedalco.com . Direct all inquiries to the Construction Manager. Addendum #1-#3 have been issued as of May 23, 2022. 1.) When submitting proposals for this project today, please make sure to utilize the SEDALCO bid form included in Specifications Section 010001 "Bid Form and Alternates". Proposals can be submitted to bids@sedalco.com. 2.) Addendum 3 referenced a Drawing 2-S101, but was inadvertently left out of the drawings that were included with that Addendum. That drawing is now included in the Addendum 3 section of the files on this job, and available for download.

Under Construction

Jails / Prisons

$83,000,000.00

Public - County

Addition, Renovation, Site Work

501

33

150

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
35
Bidding Soon
1,690
All Active Projects
641
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

June 8, 2022

img_map_placeholder

2405 S Loop 121, Belton, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.