BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, remodeling, renovation and addition to a water / sewer project in Green Cove Springs, Florida. Completed plans call for the addition of a water / sewer project.

Scope Scope of Work: Erosion Control, Sitework, Utilities, Lanscaping & Grassing, Sitework,Concrete, Masonry, Metals, Roofing, Doors, Finishes, Plumbing & HVAC, Electrical Controls, Fire Suppression, Process Equipment. Saratoga Springs Plant Site (SSPS) is located in an area south and west of Orange Park and Fleming Island. The work will consist of one Water Treatment Plant (WTP) and one Reclaimed Pumping Facility (RPF). Both of these facilities will be located on the same site and owned and operated by CCUA. The WTP portion will include well heads for two dual zone Upper and Lower Floridan raw water supply wells, Wells SS-1 and SS-2, a ground storage tank (GST) equipped with a natural draft aerator to remove hydrogen sulfide (H2S) from the raw water supply source, a sodium hypochlorite (NaOCl) storage and feed system for disinfection, a high service pump station (HSPS) for distribution, one hydropneumatic tanks for surge suppression, and an emergency generator and fuel storage tank for the Project. The RPF portion will include the well head for one Upper Floridan augmentation well (J-SS), a GST for storage of reclaimed water at the site, an HSPS for distribution, and one hydropneumatic tank for surge suppression. The pipeline portion will include approximately 1 mile each of 12-inch reclaimed and potable water main from the plant site to Sandridge Road. PROJECT Specific Requirements: 01. Deadline for Questions to Engineer:11.22.21 @ 2:00PM 02. Liquidated Damages: $200 per calendar day after Substantial Completion date 03. Schedule: 427 calendar days to Substantial Completion 04. Proposal Acceptance Period: Ninety (60) days form the date of bid deadline. 06. Minority Requirement(s): Encouraged 07. Warranty: Two (2) years from the Date of Substantial Completion or for such longer periods of time as may be set forth with respect to specific warranties contained in the trade sections of the Specifications. 08. Davis Bacon Wage Rates:N/A 09. Certified Payroll: N/A 10. American Iron and Steel: N/A SUPPLIER General Requirements: 01. Provide all of the normal and customary work necessary for a complete and operating system. Seal water trains, anchor bolts, and any other item specifically called for in the relevant specification, or related specification, shall be included. 02. Equipment or materials shall only be shipped under written direction from PSCC. 03. "Spare Parts" as mentioned in the specs shall not be shipped with equipment. Spare parts shall only be shipped under written direction from PSCC, and in specified containers with proper markings. 04. "Maintenance Materials" "Extra Stock" and "Spare Stock" shall only be shipped under written direction from PSCC. Maintenance Materials and Stock shall be shipped in the specified containers with proper markings. 05. Purchase Order includes all manufacturers' services (i.e. certification & startup) of equipment and materials as specified. 06. Vendor shall include all material, equipment and labor escalation costs for the duration of the construction schedule. 07. When or if on site, Vendor shall adhere to the PSCC General Guidelines Concerning Safety and Policy Procedures for Subcontractors, Vendors, Jobsite Visitors, which are general safety standards for all persons on site. 08. Submittals and shop drawings shall be in electronic format, or as further described in the specifications. 09. Site hours will be forty (40) hours per week, five (5) days per week; Monday through Friday, between the hours of 7:00AM and 5:30PM. SUBCONTRACTOR General Requirements: (include in all IFB's on Pipeline) 01. Supply qualified supervision, qualified operators, qualified labor, material, heavy equipment, hand tools, associated appurtenances and all other items required to complete the scope of work. 02. The subcontractor is required to coordinate their work with PSCC and all other subcontractors on site. 03. All survey and layout required for the performance of this subcontract is the responsibility of the subcontractor. PSCC will establish reference benchmarks and baselines, as specified, for subcontractor use. 04. Subcontractor shall provide Payment and Performance bonds in the amount equal to 100% of subcontract value for subcontracts in excess of $100,000; or unless otherwise noted. 05. Subcontractor shall include all federal, state and local sales and use taxes. 06. Subcontractor shall provide all necessary trade specific permits. The Building Permit and NPDES Storm Water Permit will be obtained by PSCC. 07. Materials testing shall be provided by PSCC. This does not include trade specific testing such as welding inspections or destructive/non-destructive weld testing, or other special inspections. It includes concrete, grout, soil and asphalt testing. All other testing in the various specifications required by the manufacturer, or performance testing (pressure testing pipe, hydrostatic testing of water bearing structures, etc.) shall be by this Subcontractor. 08. Subcontract includes all manufacturers' service of equipment and materials provided under this subcontract. 09. Subcontractor shall include all unloading and hoisting of equipment and materials provided under this Subcontract, or by the Owner if applicable. 10. Subcontractor shall use job site waste disposal containers provided by PSCC. All waste shall be nonhazardous and placed in the proper container, should different types of job site waste require different containers. Subcontractor will remove debris daily and provide a "broom clean" work area prior to leaving the job site each day. Waste shall be strictly limited to general waste; not demolished or excess material such as concrete, asphalt, utilities, etc. 11. Subcontractor shall use sanitary facilities provided by PSCC. 12. Subcontractor responsible for all saw cutting, core drilling and concrete patching required to accomplish the work of this subcontract. 13. Subcontractor shall furnish and install all sleeves through work of other Subcontractors, or PSCC, as required to accomplish the work of this subcontract. 14. Subcontractor to begin attending weekly jobsite coordination meetings two weeks prior to the start of their work. 15. Subcontractor shall include all material, equipment and labor escalation costs for the duration of the construction schedule. 16. Subcontractor responsible for maintenance of traffic (MOT) where and when required to accomplish the work of this subcontract. 17. Restoration of areas disturbed while conducting work is the responsibility of the Subcontractor. 19. The insurance requirements must be met prior to the start of work. SUBCONTRACTOR SHALL NOT BE ALLOWED TO START WORK OR RECEIVE PAYMENT UNTIL ALL ACCEPTABLE INSURANCE DOCUMENTATION IS RECEIVED BY PSCC. 20. Subcontractor shall adhere to the PSCC General Guidelines Concerning Safety and Policy Procedures for Subcontractors, Vendors, Jobsite Visitors, which are general safety standards for all persons on site. 21. Subcontractor shall conduct weekly gang box safety meetings. A copy of the topic and sign-in sheet shall be turned in to PSCC. 22. As-built drawings are required for installations. 23. Submittals and shop drawings shall be in electronic format. 24. Site hours will be forty (40) hours per week, five (5) days per week; Monday through Friday, between the hours of 7:00AM and 5:30PM. 25. "Spare Parts" as mentioned in the specs shall not be shipped with equipment. Spare parts shall only be shipped under written direction from PSCC, and in specified containers with proper markings. 26. "Maintenance Materials" "Extra Stock" and "Spare Stock" shall only be shipped under written direction from PSCC. Maintenance Materials and Stock shall be shipped in the specified containers with proper markings.

Post-Bid

Water / Sewer

$2,000,000.00

Public - County

Addition, Demolition, Remodeling, Renovation, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
47
Bidding Soon
797
All Active Projects
335
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2021

February 14, 2022

img_map_placeholder

3004 Feed Mill Rd, Green Cove Springs, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.